Q14, run 2026-11-05-1235-haiku

← back to the run

How many research works did GB institutions publish in 2024, under full counting and under fractional counting (each work split equally among its authors, each author's share going to their institution's country)?

Tests: Counting method at country level.

Expected: full = 7 fractional = 6

✅ R1 csv run 1 graded by code

Full 7, fractional 6.0. The GB works are W06, W12, W13, W28 (2 of 4 authors, 0.5), W29 (2 of 4, 0.5), W71 and W72.

JSON: {"full": 7, "fractional": 6.0}

✅ R1 csv run 2 graded by code

Full 7; fractional 6.0.
*Reasoning:* Seven 2024 works have a GB-affiliated author: W06, W12, W13, W71 and W72 fully, and W28 and W29 at 2 of 4 authors each (0.5 each).

JSON: {"full": 7, "fractional": 6.0}

✅ R1 csv run 3 graded by code

Full: 7. Fractional: 6.0. The GB-linked 2024 works are W06, W12, W13, W28, W29, W71 and W72. Fractional shares are 1, 1, 1, 0.5, 0.5, 1 and 1.

JSON: {"full": 7, "fractional": 6.0}

✅ R1 csv run 4 graded by code

Full 7, fractional 6. The GB works in 2024 are W06, W12, W13, W28, W29, W71 and W72.

JSON: {"full": 7, "fractional": 6}

✅ R1 csv run 5 graded by code

Full 7, fractional 6. The GB-affiliated 2024 works are W06, W12, W13, W28, W29, W71 and W72. W28 and W29 each have 2 of 4 GB authors (0.5 each), and the others are fully GB-authored (1.0 each).

JSON: {"full": 7, "fractional": 6}

✅ R2 rdf run 1 graded by code

Full: 7. Fractional: 6.0. GB institutions (I01–I06 and I13) appear on W06, W12, W13, W71 and W72 in full, and share 0.5 each on W28 and W29.

JSON: {"full": 7, "fractional": 6.0}

✅ R2 rdf run 2 graded by code

Full 7, fractional 6.0. Full counts the 2024 research works with a GB author: W06, W12, W13, W28, W29, W71, W72. In fractional counting W28 and W29 give 0.5 each (2 of 4 authors are GB) and the other five give 1 each.

JSON: {"full": 7, "fractional": 6}

✅ R2 rdf run 3 graded by code

Full 7; fractional 6.0. The GB works are W06, W12, W13, W28, W29, W71 and W72; W28 and W29 each have 2 of 4 authors in GB, so they contribute 0.5 each.

JSON: {"full": 7, "fractional": 6}

✅ R2 rdf run 4 graded by code

Full: 7. Fractional: 6. Seven 2024 research works have a GB author (W06, W12, W13, W28, W29, W71, W72). Fractional shares are 1 + 1 + 1 + 0.5 + 0.5 + 1 + 1 = 6.

JSON: {"full": 7, "fractional": 6}

✅ R2 rdf run 5 graded by code

Full 7, fractional 6.0. GB works in 2024 are W06, W12, W13, W28, W29, W71 and W72; W28 and W29 each have 2 of 4 authors in GB.

JSON: {"full": 7, "fractional": 6.0}

✅ R6 rdf+ontology run 1 graded by code

Full 7, fractional 6.0. The GB-credited 2024 works are W06, W12, W13, W28, W29, W71 and W72. Fractional shares are 1.0 for W06, W12, W13, W71 and W72, and 0.5 each for W28 and W29.

JSON: {"full": 7, "fractional": 6.0}

✅ R6 rdf+ontology run 2 graded by code

Full: 7. Fractional: 6. The seven 2024 research works with a GB-credited institution are W06, W12, W13, W28, W29, W71 and W72; W28 and W29 are the two with four authors, each giving 0.5 to GB.

JSON: {"full": 7, "fractional": 6}

✅ R6 rdf+ontology run 3 graded by code

Full: 7. Fractional: 6. The GB works are W06, W12, W13, W28, W29, W71 and W72. Fractional shares are 1.0, 1.0, 1.0, 0.5, 0.5, 1.0 and 1.0.

JSON: {"full": 7, "fractional": 6}

✅ R6 rdf+ontology run 4 graded by code

Full 7, fractional 6.0. The GB works in 2024 are W06, W12, W13, W28, W29, W71 and W72; fractional shares are 1 + 1 + 1 + 0.5 + 0.5 + 1 + 1.

JSON: {"full": 7, "fractional": 6.0}

✅ R6 rdf+ontology run 5 graded by code

Full 7; fractional 6. The GB-credited 2024 works are W06, W12, W13, W28, W29, W71 and W72; W28 and W29 give 0.5 each fractionally, the rest 1.0.

JSON: {"full": 7, "fractional": 6}

✅ R5 csv+ontology run 1 graded by code

Full: 7. Fractional: 6.0. The 2024 research works with a GB credit are W06, W12, W13, W28, W29, W71 and W72, and their GB shares add up to 6.0 (W28 and W29 contribute 0.5 each).

JSON: {"full": 7, "fractional": 6.0}

✅ R5 csv+ontology run 2 graded by code

Full 7, fractional 6. The 2024 GB works are W06, W12, W13, W28, W29, W71 and W72. Fractional shares give 1.0 + 1.0 + 1.0 + 0.5 + 0.5 + 1.0 + 1.0 = 6.0.

JSON: {"full": 7, "fractional": 6}

✅ R5 csv+ontology run 3 graded by code

Full 7; fractional 6.0. The 2024 works with a GB-credited institution are W06, W12, W13, W28, W29, W71 and W72, and each author's share goes to their own institution's country.

JSON: {"full": 7, "fractional": 6.0}

✅ R5 csv+ontology run 4 graded by code

Full 7, fractional 6.0. The 2024 research works with a GB affiliation are W06, W12, W13, W28, W29, W71 and W72. Fractional shares: W06, W12, W13, W71 and W72 each give 1.0, and W28 and W29 give 0.5 each.

JSON: {"full": 7, "fractional": 6.0}

✅ R5 csv+ontology run 5 graded by code

Full 7; fractional 6.0. Full counts W06, W12, W13, W28, W29, W71 and W72. Fractional gives 1, 1, 1, 0.5, 0.5, 1 and 1.

JSON: {"full": 7, "fractional": 6}

✅ R4 csv+markdown run 1 graded by code

Full 7; fractional 6.0. The GB works are W06, W12, W13, W28, W29, W71 and W72. W28 and W29 each give GB 0.5, and the other five give GB 1.0 each.

JSON: {"full": 7, "fractional": 6.0}

✅ R4 csv+markdown run 2 graded by code

Full 7, fractional 6.0. The 2024 research works with a GB credit are W06, W12, W13, W28, W29, W71 and W72. Fractional shares for GB authors are 1, 1, 1, 0.5, 0.5, 1 and 1.

JSON: {"full": 7, "fractional": 6}

✅ R4 csv+markdown run 3 graded by code

Full 7, fractional 6.0. The 2024 GB-credited works are W06, W12, W13, W28, W29, W71 and W72. The fractional total sums each GB author's 1/N share.

JSON: {"full": 7, "fractional": 6.0}

✅ R4 csv+markdown run 4 graded by code

Full 7, fractional 6. The GB-credited 2024 works are W06, W12, W13, W28, W29, W71 and W72. W28 and W29 each give GB 0.5 (two of four authors), and the other five give 1.0.

JSON: {"full": 7, "fractional": 6}

✅ R4 csv+markdown run 5 graded by code

Full 7, fractional 6.0. GB-credited 2024 works are W06, W12, W13, W28, W29, W71 and W72. W28 and W29 give 0.5 each under fractional counting.

JSON: {"full": 7, "fractional": 6.0}

✅ R3 csv+padding run 1 graded by code

Full: 7. Fractional: 6.0. The GB-affiliated 2024 works are W06, W12, W13, W28, W29, W71 and W72.

JSON: {"full": 7, "fractional": 6.0}

✅ R3 csv+padding run 2 graded by code

Full 7, fractional 6.0. The GB works in 2024 are W06, W12, W13, W28, W29, W71 and W72; W28 and W29 each contribute only 0.5 because two of their four authors are GB.

JSON: {"full": 7, "fractional": 6.0}

✅ R3 csv+padding run 3 graded by code

Full 7; fractional 6.0. The GB-affiliated 2024 works are W06, W12, W13, W28, W29, W71 and W72. W28 and W29 give 0.5 each (two of four authors), and the rest give 1.0.

JSON: {"full": 7, "fractional": 6.0}

✅ R3 csv+padding run 4 graded by code

Full 7; fractional 6.0. The GB-affiliated 2024 works are W06, W12, W13, W28, W29, W71, W72. W28 and W29 each give 0.5 (two GB authors of four).

JSON: {"full": 7, "fractional": 6.0}

✅ R3 csv+padding run 5 graded by code

Full: 7 (W06, W12, W13, W28, W29, W71, W72). Fractional: 6.0. W28 and W29 give 0.5 each, and the other five give 1.0 each.

JSON: {"full": 7, "fractional": 6.0}

✅ R10 executed run 1 graded by code

Full 7, fractional 6. The GB-affiliated 2024 research works are W06, W12, W13, W28, W29, W71, W72; in W28 and W29, two of four author shares go to GB.

JSON: {"full": 7, "fractional": 6}

✅ R10 executed run 2 graded by code

Full 7, fractional 6.0. The seven 2024 works with a GB-credited author are W06, W12, W13, W28, W29, W71 and W72. W28 and W29 each contribute 0.5 and the other five contribute 1.0 each.

JSON: {"full": 7, "fractional": 6.0}

✅ R10 executed run 3 graded by code

Full 7 (W06, W12, W13, W28, W29, W71, W72). Fractional 6.0, because W28 and W29 each give 0.5 and the other five give 1 each.

JSON: {"full": 7, "fractional": 6}

✅ R10 executed run 4 graded by code

Full 7; fractional 6. The GB-credited works are W06, W12, W13, W28, W29, W71 and W72. W28 and W29 each give GB 0.5 because two of their four authors are at GB institutions.

JSON: {"full": 7, "fractional": 6}

✅ R10 executed run 5 graded by code

Full 7, fractional 6. The GB works in 2024 are W06, W12, W13, W28, W29, W71 and W72; in fractional terms, W28 and W29 each contribute 1/2 and the other five contribute 1 each.

JSON: {"full": 7, "fractional": 6}