Q1, run 2026-11-05-2135-sonnet
What was Kestrel Energy's rating on 1 January 2025?
Tests: Time: a rating holds from one action to the next, so 'the rating on a date' is the latest action on or before it.
Expected: rating = A-
csv run 1
A-. A01 (2024-03-12) set A-, and the next action, A02, is dated 2025-06-20.
JSON: {"rating": "A-"}
csv run 2
A-. Kestrel's LTIDR (FC) was A- from A01 (2024-03-12) until the downgrade to BBB in A02 (2025-06-20).
JSON: {"rating": "A-"}
csv run 3
A-. LTIDR FC was A- from A01 (2024-03-12) until A02 (2025-06-20).
JSON: {"rating": "A-"}
csv run 4
A-. A01 assigned A- on 2024-03-12, and the next action (A02, downgrade to BBB) came on 2025-06-20.
JSON: {"rating": "A-"}
csv run 5
A-. E01 was assigned A- (A01) and not downgraded to BBB until A02 on 2025-06-20.
JSON: {"rating": "A-"}
rdf run 1
A- (Kestrel Energy, E01). A01 set the long-term rating at A- on 2024-03-12, and the next change, A02 (BBB), came on 2025-06-20.
JSON: {"rating": "A-"}
rdf run 2
A-. E01's long-term IDR was A- (A01, 2024-03-12) until the downgrade to BBB on 2025-06-20 (A02).
JSON: {"rating": "A-"}
rdf run 3
A-. A01 (E01, long-term IDR A-, assigned 2024-03-12) was still in force on that date, because the downgrade in A02 came on 2025-06-20.
JSON: {"rating": "A-"}
rdf run 4
A-. A01 (E01 AS A- 2024-03-12) is the latest foreign-currency issuer rating before that date; the next change is A02 on 2025-06-20.
JSON: {"rating": "A-"}
rdf run 5
A-. A01 assigned A- on 2024-03-12, and the next action (A02, DG to BBB) is dated 2025-06-20.
JSON: {"rating": "A-"}
rdf+ontology run 1
A-. E01's FC LTIDR was A- from A01 (2024-03-12) until the downgrade A02 (2025-06-20).
JSON: {"rating": "A-"}
rdf+ontology run 2
A-. E01's last action on or before 1 Jan 2025 was A01 (assigned A- on 2024-03-12). The downgrade to BBB (A02) came on 2025-06-20.
JSON: {"rating": "A-"}
rdf+ontology run 3
A-. E01's long-term foreign-currency rating was set by A01 (A-, 2024-03-12) and unchanged until A02 (2025-06-20).
JSON: {"rating": "A-"}
rdf+ontology run 4
A-. E01 was assigned A- on 2024-03-12 (A01), and the next action, a downgrade to BBB, only came on 2025-06-20 (A02).
JSON: {"rating": "A-"}
rdf+ontology run 5
A-. E01 was assigned A- on 2024-03-12 (A01); the next action was the downgrade to BBB on 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv+ontology run 1
A-. Assigned A- (A01, 2024-03-12); the downgrade to BBB came later (A02, 2025-06-20).
JSON: {"rating": "A-"}
csv+ontology run 2
A-. Kestrel Energy (E01) was assigned A- (A01, 2024-03-12); the downgrade to BBB (A02) came on 2025-06-20.
JSON: {"rating": "A-"}
csv+ontology run 3
A-. E01's LTIDR FC was assigned A- (A01) and not cut to BBB until 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv+ontology run 4
A-. E01's rating was set by A01 (2024-03-12) and not changed until A02 (2025-06-20).
JSON: {"rating": "A-"}
csv+ontology run 5
A-. A01 (2024-03-12) set A-, and the next action, A02, came on 2025-06-20.
JSON: {"rating": "A-"}
csv+markdown run 1
A-. E01's LTIDR FC was assigned A- on 2024-03-12 (A01) and not changed until A02 on 2025-06-20.
JSON: {"rating": "A-"}
csv+markdown run 2
A-. The latest action on or before 1 Jan 2025 is A01 (2024-03-12, assigned A-). The next one, A02, is dated June 2025.
JSON: {"rating": "A-"}
csv+markdown run 3
A-. E01's latest action on or before 1 Jan 2025 is A01 (2024-03-12, A-); the downgrade A02 came in June 2025.
JSON: {"rating": "A-"}
csv+markdown run 4
A-. E01's last action on or before that date is A01 (2024-03-12, A-). The downgrade to BBB (A02) came in June 2025.
JSON: {"rating": "A-"}
csv+markdown run 5
A-. E01's LTIDR FC was A- from A01 (2024-03-12) until A02 (2025-06-20).
JSON: {"rating": "A-"}
csv+padding run 1
A-. A01 (E01, 2024-03-12) set A-; the downgrade A02 came on 2025-06-20.
JSON: {"rating": "A-"}
csv+padding run 2
A-. E01 was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv+padding run 3
A-. A01 assigned A- (2024-03-12); the next action, A02, was not until 2025-06-20.
JSON: {"rating": "A-"}
csv+padding run 4
A-. A01 assigned A- to E01 on 2024-03-12, and the next action (A02) came on 2025-06-20.
JSON: {"rating": "A-"}
csv+padding run 5
A-. E01 was assigned A- on 2024-03-12 (A01), and the downgrade to BBB came later, on 2025-06-20 (A02).
JSON: {"rating": "A-"}
executed run 1
A-. E01's LTIDR was A- (A01) from 2024-03-12 to 2025-06-20, which covers 1 Jan 2025.
JSON: {"rating": "A-"}
executed run 2
A-. E01's LTIDR was A- from 2024-03-12 to 2025-06-20 (A01), which covers 1 Jan 2025.
JSON: {"rating": "A-"}
executed run 3
A-. E01's rating A1 (A-) ran 2024-03-12 to 2025-06-20, so it held on 1 Jan 2025.
JSON: {"rating": "A-"}
executed run 4
A-. E01's A- (A01) was in force 2024-03-12 to 2025-06-20.
JSON: {"rating": "A-"}
executed run 5
A-. E01's LTIDR was A- from 2024-03-12 to 2025-06-20 (A01).
JSON: {"rating": "A-"}
csv+neutral run 1
A-. A01 (2024-03-12) assigned E01 A-, and the next action is A02 on 2025-06-20.
JSON: {"rating": "A-"}
csv+neutral run 2
A-. E01's rating on 2025-01-01 was the one assigned in A01 (2024-03-12). The downgrade to BBB came later, in A02 (2025-06-20).
JSON: {"rating": "A-"}
csv+neutral run 3
A-. E01's latest action on or before 2025-01-01 is A01 (A-); the downgrade A02 came in June 2025.
JSON: {"rating": "A-"}
csv+neutral run 4
A-. A01 (2024-03-12) set A-, and the next action (A02) is dated 2025-06-20.
JSON: {"rating": "A-"}
csv+neutral run 5
A-. A01 (2024-03-12) set A-, and the next action, A02, is dated 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms run 1
A-. A01 assigned A- on 2024-03-12 and A02 (downgrade to BBB) came only on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms run 2
A-. A01 assigned A- on 2024-03-12 and it stayed in force until A02 (2025-06-20).
JSON: {"rating": "A-"}
csv+axioms run 3
A-. E01's LTIDR was assigned A- on 2024-03-12 (A01) and not changed until the downgrade to BBB on 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv+axioms run 4
A-. A01 assigned E01 A- on 2024-03-12, and the next change was A02 (DG to BBB) on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms run 5
A-. E01's LTIDR (FC) was assigned A- on 2024-03-12 (A01) and not changed until the 2025-06-20 downgrade (A02).
JSON: {"rating": "A-"}
csv+axioms+markdown run 1
A-. E01's last action on or before 2025-01-01 was A01 (assigned A-, 2024-03-12); the downgrade A02 came on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms+markdown run 2
A-. E01's rating was A- (A01, 2024-03-12) until the downgrade to BBB on 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv+axioms+markdown run 3
A-. A01 assigned A- on 2024-03-12, and A02 did not downgrade it until 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms+markdown run 4
A-. A01 assigned A- on 2024-03-12, and A02 did not downgrade it until 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms+markdown run 5
A-. E01's LTIDR (FC) was assigned A- on 2024-03-12 (A01), and the downgrade to BBB came on 2025-06-20 (A02).
JSON: {"rating": "A-"}