Q12, run 2026-11-05-2135-haiku

← back to the run

What was Marlow Utilities' rating on 1 January 2024?

Tests: Time: the rating on a date before a later downgrade.

Expected: rating = A-

✅ R1 csv run 1 graded by code

A-
E14's rating was A- from A34 (2023-01-15) until A36.

JSON: {"rating": "A-"}

✅ R1 csv run 2 graded by code

A-. This was the rating from the 2023-01-15 assignment (A34).

JSON: {"rating": "A-"}

✅ R1 csv run 3 graded by code

A-. A34 (2023-01-15) set A-, and it was unchanged on 2024-01-01.

JSON: {"rating": "A-"}

✅ R1 csv run 4 graded by code

A-. E14 was assigned A- on 2023-01-15 (A34) and was not downgraded until 2024-09-30 (A36).

JSON: {"rating": "A-"}

✅ R1 csv run 5 graded by code

A-. A34 (2023-01-15) assigned A-, and no change followed before 2024.

JSON: {"rating": "A-"}

✅ R2 rdf run 1 graded by code

A-. The last rating before 1 Jan 2024 is A34 (A-, 2023-01-15).

JSON: {"rating": "A-"}

✅ R2 rdf run 2 graded by code

A-. E14's rating was A- from A34 (2023-01-15) until A36.

JSON: {"rating": "A-"}

✅ R2 rdf run 3 graded by code

A-. The A- assignment on 15 Jan 2023 (A34) was the latest action before 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R2 rdf run 4 graded by code

A-. The latest action before 1 Jan 2024 is A- assigned on 2023-01-15 (A34).

JSON: {"rating": "A-"}

✅ R2 rdf run 5 graded by code

A-. E14's A34 (AS, 2023-01-15) was the rating in force on 2024-01-01.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 1 graded by code

A-.
E14's latest action before 2024-01-01 is A34 (Assigned A-, 2023-01-15).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 2 graded by code

A-. A34 (Assigned A-, 2023-01-15) is the latest action before 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 3 graded by code

A-. A34 (AS A-, 2023-01-15) is the latest action on or before 2024-01-01; A36 came later.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 4 graded by code

A-. The only earlier action is A34 (AS A-, 2023-01-15).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 5 graded by code

A-
E14's latest action before 1 Jan 2024 is A34 (AS A-, 2023-01-15).

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 1 graded by code

A-. A34 (2023-01-15, AS, A-) was the latest action before 2024-01-01.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 2 graded by code

A-. A34 (2023-01-15, AS A-) was the rating on that date.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 3 graded by code

(no answer found)

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 4 graded by code

A-. A34 (AS, 2023-01-15) is the only action before 2024-01-01.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 5 graded by code

A-. A34 (assigned 2023-01-15) was the rating on 2024-01-01.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 1 graded by code

A-. A34 (2023-01-15) assigned A-, and A36 came later.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 2 graded by code

A-. A34 (2023-01-15) assigned A-, and nothing changed it before 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 3 graded by code

A-. This is the A- assigned on 2023-01-15 (A34). (E14)

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 4 graded by code

A-. A34 (2023-01-15) assigned A- and nothing changed it before 2024.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 5 graded by code

A-. Marlow Utilities (E14) was assigned A- on 15 Jan 2023 (A34), and no action preceded 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 1 graded by code

A-. A34 (2023-01-15) set A-, and the next action is A36 in 2024.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 2 graded by code

A-. The assignment of A- on 2023-01-15 (A34) was the only rating then.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 3 graded by code

A-. The assignment (A34, 2023-01-15) was the latest action on 2024-01-01.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 4 graded by code

A-. A34 (2023-01-15) assigned A-, and the first later change is A36 on 2024-09-30.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 5 graded by code

A-. A34 assigned A- on 2023-01-15.

JSON: {"rating": "A-"}

✅ R10 executed run 1 graded by code

A-. E14's A- ran 2023-01-15 to 2024-09-30.

JSON: {"rating": "A-"}

✅ R10 executed run 2 graded by code

A-. E14's A- ran from 2023-01-15 to 2024-09-30 (A34).

JSON: {"rating": "A-"}

✅ R10 executed run 3 graded by code

A-. E14's A- ran until 2024-09-30 (A34).

JSON: {"rating": "A-"}

✅ R10 executed run 4 graded by code

A-. Marlow Utilities (E14) was A- from 2023-01-15 to 2024-09-30 (A34).

JSON: {"rating": "A-"}

✅ R10 executed run 5 graded by code

A-. E14's rating from 2023-01-15 to 2024-09-30 was A- (A34).

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 1 graded by code

A-. A34 (AS, 2023-01-15) is the latest action before 2024-01-01.

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 2 graded by code

A-. The only action before 1 Jan 2024 is the 2023-01-15 assignment of A- (A34) on E14.

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 3 graded by code

A-. A34 (AS, 2023-01-15) is the rating on 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 4 graded by code

A-, from A34 (2023-01-15).

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 5 graded by code

A-. A34 (assigned A-, 2023-01-15) is the latest action before 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 1 graded by code

A-. A34 (assigned A-, 2023-01-15) was in force before A36.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 2 graded by code

A-. The only action before 1 Jan 2024 is A34 (2023-01-15, A-).

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 3 graded by code

A-. A34 (2023-01-15) is the latest action before 2024-01-01.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 4 graded by code

A-. A34 (AS, 2023-01-15) was the only action before 2024-01-01.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 5 graded by code

A-. The only action before 2024-01-01 is the assignment of A- on 2023-01-15 (A34).

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 1 graded by code

A-. The first rating was assigned at A- on 2023-01-15 (A34), and that was still in force on 1 January 2024.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 2 graded by code

A-.
A34 (2023-01-15, AS, A-) is the latest rating on or before 2024-01-01.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 3 graded by code

A-. A34 (2023-01-15) assigned A-, which held on 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 4 graded by code

A-. Marlow was assigned A- on 2023-01-15 (A34), and that was its rating on 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 5 graded by code

A-. The latest action on or before 2024-01-01 is A34 (assigned A-, 2023-01-15) on E14.

JSON: {"rating": "A-"}