Q11, run 2026-11-05-2135-haiku
What was Marlow Utilities' rating on 1 June 2025?
Tests: Time: Marlow's actions are not in date order in the file.
Expected: rating = BBB+
csv run 1
BBB+
E14's rating from A36 (2024-09-30 DG to BBB+) was in force on 2025-06-01.
JSON: {"rating": "BBB+"}
csv run 2
BBB+. The rating was set at BBB+ by the downgrade on 2024-09-30 (A36), and the Rating Watch on 2025-11-20 (A35) did not change the rating level.
JSON: {"rating": "BBB+"}
csv run 3
BBB+. The DG to BBB+ (A36) dated 2024-09-30 was still in force on 2025-06-01.
JSON: {"rating": "BBB+"}
csv run 4
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and that was still its rating on 1 Jun 2025.
JSON: {"rating": "BBB+"}
csv run 5
BBB+. A36 (2024-09-30) set BBB+, and the later RW (A35) didn't change the rating until 2026.
JSON: {"rating": "BBB+"}
rdf run 1
BBB+. The downgrade to BBB+ (A36, 2024-09-30) is still in effect on 1 Jun 2025.
JSON: {"rating": "BBB+"}
rdf run 2
BBB+. E14's latest rating before 1 Jun 2025 is A36 (DG, BBB+, 2024-09-30).
JSON: {"rating": "BBB+"}
rdf run 3
BBB+. Marlow Utilities (E14) was BBB+ from its 30 Sep 2024 downgrade (A36) through 1 Jun 2025.
JSON: {"rating": "BBB+"}
rdf run 4
BBB+. The most recent action before 1 Jun 2025 is the downgrade to BBB+ on 2024-09-30 (A36).
JSON: {"rating": "BBB+"}
rdf run 5
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and that rating held through 2025-06-01.
JSON: {"rating": "BBB+"}
rdf+ontology run 1
BBB+.
E14's latest action before 2025-06-01 is A36 (Downgraded to BBB+, 2024-09-30).
JSON: {"rating": "BBB+"}
rdf+ontology run 2
BBB+. A36 (downgraded to BBB+, 2024-09-30) is the latest action before 1 Jun 2025.
JSON: {"rating": "BBB+"}
rdf+ontology run 3
BBB+. A36 (DG to BBB+, 2024-09-30) is the latest action on or before 2025-06-01.
JSON: {"rating": "BBB+"}
rdf+ontology run 4
BBB+. The latest action on or before 1 Jun 2025 is A36 (DG BBB+, 2024-09-30).
JSON: {"rating": "BBB+"}
rdf+ontology run 5
BBB+
E14's latest action before 1 Jun 2025 is A36 (DG to BBB+, 2024-09-30).
JSON: {"rating": "BBB+"}
csv+ontology run 1
BBB+. E14's DG to BBB+ (A36, 2024-09-30) was the latest rating action before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+ontology run 2
BBB+. A36 (2024-09-30, DG to BBB+) is the latest action before 1 Jun 2025.
JSON: {"rating": "BBB+"}
csv+ontology run 3
(no answer found)
JSON: {"rating": "BBB+"}
csv+ontology run 4
BBB+. A36 (DG to BBB+, 2024-09-30) is the latest action on or before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+ontology run 5
BBB+. The 2024-09-30 downgrade to BBB+ (A36) was still in effect on 2025-06-01.
JSON: {"rating": "BBB+"}
csv+markdown run 1
BBB+. E14's rating on 1 June 2025 was set by A36 (2024-09-30, DG to BBB+); the RW action A35 came later.
JSON: {"rating": "BBB+"}
csv+markdown run 2
BBB+. A36 (2024-09-30) set BBB+; the later RW (A35) and AF (A33) did not change it.
JSON: {"rating": "BBB+"}
csv+markdown run 3
BBB+. The downgrade to BBB+ (A36, 2024-09-30) still held on 1 Jun 2025. (E14)
JSON: {"rating": "BBB+"}
csv+markdown run 4
BBB+. DG A36 (2024-09-30) set BBB+, and no action came until RW on 2025-11-20.
JSON: {"rating": "BBB+"}
csv+markdown run 5
BBB+. Marlow Utilities (E14) was downgraded to BBB+ on 30 Sep 2024 (A36), and that is still the latest rating on 1 Jun 2025.
JSON: {"rating": "BBB+"}
csv+padding run 1
BBB+. A36 (2024-09-30) set BBB+ and no later rating action changed it before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+padding run 2
BBB+. The DG to BBB+ on 2024-09-30 (A36) was the last rating change before that date.
JSON: {"rating": "BBB+"}
csv+padding run 3
BBB+. The 2024-09-30 downgrade (A36) is the latest action before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+padding run 4
BBB+. A36 (2024-09-30) moved E14 from A- to BBB+, and no later rating change happened before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+padding run 5
BBB+. The downgrade to BBB+ on 2024-09-30 (A36) was still in place on 2025-06-01, and the 2025 rating watch did not change the rating.
JSON: {"rating": "BBB+"}
executed run 1
BBB+. E14 was BBB+ (DG) from 2024-09-30 to 2025-11-20.
JSON: {"rating": "BBB+"}
executed run 2
BBB+. E14 was BBB+ from 2024-09-30 to 2025-11-20 (A36), which includes 1 Jun 2025.
JSON: {"rating": "BBB+"}
executed run 3
BBB+. E14's BBB+ ran from 2024-09-30 to 2025-11-20 (A36).
JSON: {"rating": "BBB+"}
executed run 4
BBB+. Marlow Utilities (E14) was BBB+ from 2024-09-30 to 2025-11-20 (A36).
JSON: {"rating": "BBB+"}
executed run 5
BBB+. E14's rating from 2024-09-30 to 2025-11-20 was BBB+ (A36).
JSON: {"rating": "BBB+"}
csv+neutral run 1
BBB+. The latest action before 2025-06-01 is A36 (DG to BBB+, 2024-09-30). The later RW (A35) does not change the rating.
JSON: {"rating": "BBB+"}
csv+neutral run 2
BBB+. The latest action before 1 Jun 2025 is the 2024-09-30 downgrade to BBB+ (A36) on E14.
JSON: {"rating": "BBB+"}
csv+neutral run 3
BBB+. A36 (DG, 2024-09-30) is the latest action before 1 Jun 2025; A35 (RW) comes later.
JSON: {"rating": "BBB+"}
csv+neutral run 4
BBB+. A36 (DG to BBB+, 2024-09-30) is the latest action before 2025-06-01; the RW of 2025-11-20 is after that date.
JSON: {"rating": "BBB+"}
csv+neutral run 5
BBB+. A36 (downgrade to BBB+, 2024-09-30) is the latest action on E14 before 1 Jun 2025.
JSON: {"rating": "BBB+"}
csv+axioms run 1
BBB+. A36 (downgraded to BBB+, 2024-09-30) was in force; the next action, A35, is dated 2025-11-20.
JSON: {"rating": "BBB+"}
csv+axioms run 2
BBB+. The DG to BBB+ (A36, 2024-09-30) was the latest action before 1 Jun 2025.
JSON: {"rating": "BBB+"}
csv+axioms run 3
BBB+. A36 (downgraded to BBB+, 2024-09-30) is the latest action before 2025-06-01; the watch placement (A35) came later on 2025-11-20.
JSON: {"rating": "BBB+"}
csv+axioms run 4
BBB+. On 2025-06-01 the latest action was A36 (DG to BBB+, 2024-09-30); A35 (RW) came later.
JSON: {"rating": "BBB+"}
csv+axioms run 5
BBB+. The most recent action before 2025-06-01 is the downgrade to BBB+ on 2024-09-30 (A36).
JSON: {"rating": "BBB+"}
csv+axioms+markdown run 1
BBB+. The rating was set at BBB+ by the 2024-09-30 downgrade (A36) and no action changed it before 1 June 2025.
JSON: {"rating": "BBB+"}
csv+axioms+markdown run 2
BBB+.
A36 (2024-09-30, DG to BBB+) is the latest rating on or before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+axioms+markdown run 3
BBB+. A36 (2024-09-30) downgraded E14 to BBB+, and nothing before 2025-06-01 changes it.
JSON: {"rating": "BBB+"}
csv+axioms+markdown run 4
BBB+. Marlow's last rating action before 1 Jun 2025 was the downgrade to BBB+ (A36, 2024-09-30).
JSON: {"rating": "BBB+"}
csv+axioms+markdown run 5
BBB+. The latest action on or before 2025-06-01 is A36 (downgraded to BBB+, 2024-09-30) on E14.
JSON: {"rating": "BBB+"}