Q1, run 2026-11-05-2135-haiku

← back to the run

What was Kestrel Energy's rating on 1 January 2025?

Tests: Time: a rating holds from one action to the next, so 'the rating on a date' is the latest action on or before it.

Expected: rating = A-

✅ R1 csv run 1 graded by code

A-
Kestrel's LTIDR was A- from A01 (2024-03-12) until the downgrade in A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R1 csv run 2 graded by code

A-. Kestrel Energy (E01) was assigned A- on 2024-03-12 (A01) and not changed until a downgrade to BBB on 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R1 csv run 3 graded by code

A-. E01 was rated A- from A01 (2024-03-12) until it was downgraded to BBB by A02 (2025-06-20), so on 2025-01-01 it was still A-.

JSON: {"rating": "A-"}

✅ R1 csv run 4 graded by code

A-. Kestrel Energy (E01) was assigned A- on 2024-03-12 (A01) and downgraded to BBB on 2025-06-20 (A02), so it was still A- on 1 Jan 2025.

JSON: {"rating": "A-"}

✅ R1 csv run 5 graded by code

A-. A01 (2024-03-12) assigned A-, and the downgrade to BBB (A02) came on 2025-06-20, after 1 Jan 2025.

JSON: {"rating": "A-"}

✅ R2 rdf run 1 graded by code

A-. The last LTIDR action before 1 Jan 2025 is A01 (AS A-, 2024-03-12); A02 (BBB) came later, in June 2025.

JSON: {"rating": "A-"}

✅ R2 rdf run 2 graded by code

A- (on 1 Jan 2025). Kestrel Energy (E01) was rated A- from A01 (2024-03-12) until the downgrade to BBB in A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R2 rdf run 3 graded by code

A-. Kestrel Energy (E01) was rated A- from 12 Mar 2024 (A01) until its downgrade to BBB on 20 Jun 2025 (A02), so on 1 Jan 2025 it was still A-.

JSON: {"rating": "A-"}

✅ R2 rdf run 4 graded by code

A-. Kestrel Energy's latest issuer rating before 1 Jan 2025 is A-, assigned on 2024-03-12 (A01); the next action, a downgrade to BBB, came on 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R2 rdf run 5 graded by code

A-. E01 A01 (AS, 2024-03-12) was the rating in force on 2025-01-01; the downgrade to BBB came on 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 1 graded by code

A- (FC, long-term issuer rating).
E01's latest LTIDR FC action before 2025-01-01 is A01 (Assigned A-, 2024-03-12); A02 (BBB) is dated 2025-06-20.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 2 graded by code

A-. Action A01 (E01 Assigned A-, 2024-03-12) is the latest foreign-currency long-term rating before 1 Jan 2025.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 3 graded by code

A-. The latest FC issuer rating on or before 1 Jan 2025 is A01 (Assigned A-, 2024-03-12). The downgrade to BBB came later, in A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 4 graded by code

A- (A01, the 2024-03-12 assignment, is the latest FC issuer action before 1 Jan 2025; no action on E01 falls between it and that date).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 5 graded by code

A-
E01's latest long-term FC action before 1 Jan 2025 is A01 (AS A-, 2024-03-12); A02 (DG BBB) came later, on 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 1 graded by code

A-. E01's LTIDR FC rating from A01 (2024-03-12, AS A-) still stood on 2025-01-01; the first downgrade (A02) came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 2 graded by code

A-. A01 (2024-03-12, AS A-) is the latest FC action before 1 Jan 2025; the downgrade to BBB (A02) came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 3 graded by code

(no answer found)

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 4 graded by code

A- (A01, the latest action on or before 2025-01-01, is the 2024-03-12 assignment).
Reasoning: E01's only LTIDR action before 2025 is A01 (A-). The 2025-06-20 downgrade (A02) comes later.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 5 graded by code

A-. The latest action on or before 2025-01-01 is A01 (assigned A-, 2024-03-12); the downgrade to BBB (A02) came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 1 graded by code

A-. E01's rating was set to A- by A01 (2024-03-12), before the BBB downgrade in A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 2 graded by code

A-. Kestrel's rating set by A01 (2024-03-12) held until A02 (2025-06-20) downgraded it to BBB.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 3 graded by code

A-. The A01 assignment (2024-03-12, A-) is the latest FC action on or before 1 Jan 2025; the next, A02, is dated 2025-06-20. (E01)

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 4 graded by code

A-. A01 (2024-03-12, A-) is the latest action before 1 Jan 2025; A02 (DG to BBB) came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 5 graded by code

A-. Kestrel Energy (E01) was assigned A- on 12 Mar 2024 (A01), and the next FC action was the 20 Jun 2025 downgrade to BBB (A02), so the rating on 1 Jan 2025 was still A-.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 1 graded by code

A-. The FC issuer rating was A- from A01 (2024-03-12) until downgraded to BBB by A02 on 2025-06-20 for E01.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 2 graded by code

A-. The LTIDR assigned 2024-03-12 (A01) was A- until downgraded to BBB on 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R3 csv+padding run 3 graded by code

A-. The 2024-03-12 assignment (A01) is the latest action before 2025-01-01; the downgrade to BBB came on 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R3 csv+padding run 4 graded by code

A-. A01 (2024-03-12) assigned A-, and the downgrade to BBB came in A02 on 2025-06-20, after the date.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 5 graded by code

A-. A01 assigned A- on 2024-03-12, and the downgrade to BBB (A02) came on 2025-06-20, after the date asked about.

JSON: {"rating": "A-"}

✅ R10 executed run 1 graded by code

A-. E01's FC LTIDR A- ran 2024-03-12 to 2025-06-20, which covers 1 Jan 2025.

JSON: {"rating": "A-"}

✅ R10 executed run 2 graded by code

A-. E01's FC LTIDR rating was A- from 2024-03-12 to 2025-06-20 (record A01), so it held A- on 1 Jan 2025.

JSON: {"rating": "A-"}

✅ R10 executed run 3 graded by code

A-. E01's FC rating was A- from 2024-03-12 to 2025-06-20 (A01).

JSON: {"rating": "A-"}

✅ R10 executed run 4 graded by code

A-. E01's FC LTIDR rating of A- ran from 2024-03-12 to 2025-06-20 (A01), which covers 1 Jan 2025.

JSON: {"rating": "A-"}

✅ R10 executed run 5 graded by code

A-. E01's A- rating (A01) ran from 2024-03-12 to 2025-06-20, which covers 1 Jan 2025.

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 1 graded by code

A-. The latest Kestrel FC action on or before 2025-01-01 is A01 (AS, A-, 2024-03-12); the downgrade came later in A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 2 graded by code

A-. Kestrel's last action before 1 Jan 2025 was the assignment of A- (A01, 2024-03-12) on E01; the downgrade to BBB came later (A02, 2025-06-20).

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 3 graded by code

A-. Only A01 (AS, A-, 2024-03-12) applies on 1 Jan 2025; the downgrade (A02) came later, on 2025-06-20.

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 4 graded by code

A- (A01 is the latest action on or before 2025-01-01, an assignment at A-).

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 5 graded by code

A-. The latest FC LTIDR action on E01 before 1 Jan 2025 is A01 (assigned A-, 2024-03-12); the next action, A02, is dated 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 1 graded by code

A- (E01). A01 (assigned A-, 2024-03-12) was in force until A02 downgraded it to BBB on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 2 graded by code

A-. E01's LTIDR action A01 (2024-03-12, A-) was the latest on 1 Jan 2025; the downgrade to BBB came later (A02, 2025-06-20).

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 3 graded by code

A-. A01 (2024-03-12, assigned A-) is the latest action before 2025-01-01; the downgrade to BBB (A02) came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 4 graded by code

A-. A01 (2024-03-12, AS, A-) was in force until A02 downgraded it to BBB on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 5 graded by code

A- (Kestrel's FC issuer rating was assigned A- on 2024-03-12 (A01) and not changed until the downgrade to BBB on 2025-06-20 (A02)).

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 1 graded by code

A-. Kestrel's FC issuer rating was assigned A- on 2024-03-12 (A01) and not changed until the downgrade to BBB on 2025-06-20 (A02). Record: E01.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 2 graded by code

A-
A01 (2024-03-12, AS, FC) is the latest FC long-term rating on or before 2025-01-01; the next action, A02, is dated 2025-06-20.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 3 graded by code

A-. A01 (2024-03-12) assigned A-, and the cut to BBB came later, in A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 4 graded by code

A-. E01's last LTIDR action before 1 Jan 2025 was A01 (2024-03-12, assigned A-); the downgrade to BBB came in A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 5 graded by code

A-. Kestrel's last FC issuer action before 1 Jan 2025 was A01 (assigned A-, 2024-03-12) on E01; A02 came later (2025-06-20).

JSON: {"rating": "A-"}