Q11, run 2026-11-05-1227-sonnet
What was Marlow Utilities' rating on 1 June 2025?
Tests: Time: Marlow's actions are not in date order in the file.
Expected: rating = BBB+
csv run 1
BBB+. A36 downgraded it on 2024-09-30, and A35 on 2025-11-20 was only a watch.
JSON: {"rating": "BBB+"}
csv run 2
BBB+. A36 downgraded Marlow to BBB+ on 2024-09-30, and A35 (2025-11-20) is later than the date asked.
JSON: {"rating": "BBB+"}
csv run 3
BBB+. E14 was downgraded from A- to BBB+ on 2024-09-30 (A36), and nothing changed the rating before 2025-06-01.
JSON: {"rating": "BBB+"}
csv run 4
BBB+. A36 downgraded to BBB+ on 2024-09-30, and A35 (2025-11-20) came later.
JSON: {"rating": "BBB+"}
csv run 5
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the watch in A35 came later.
JSON: {"rating": "BBB+"}
rdf run 1
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the next action is 2025-11-20 (A35).
JSON: {"rating": "BBB+"}
rdf run 2
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and A35 (2025-11-20) came later.
JSON: {"rating": "BBB+"}
rdf run 3
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and nothing changed the rating before 2025-11-20.
JSON: {"rating": "BBB+"}
rdf run 4
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the watch in A35 came later.
JSON: {"rating": "BBB+"}
rdf run 5
BBB+. A36 (2024-09-30) was the latest action before that date.
JSON: {"rating": "BBB+"}
rdf+ontology run 1
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the Watch in A35 came later (2025-11-20).
JSON: {"rating": "BBB+"}
rdf+ontology run 2
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the Watch of 2025-11-20 (A35) came later.
JSON: {"rating": "BBB+"}
rdf+ontology run 3
BBB+. A36 (2024-09-30) downgraded it, and the next action is A35 (a Watch, rating unchanged).
JSON: {"rating": "BBB+"}
rdf+ontology run 4
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the next action was A35 on 2025-11-20.
JSON: {"rating": "BBB+"}
rdf+ontology run 5
BBB+, from the downgrade in A36 (2024-09-30). The watch in A35 came later and did not change the rating.
JSON: {"rating": "BBB+"}
csv+ontology run 1
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30.
JSON: {"rating": "BBB+"}
csv+ontology run 2
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the next action (A35) was not until 2025-11-20.
JSON: {"rating": "BBB+"}
csv+ontology run 3
BBB+. A36 (2024-09-30) downgraded E14 to BBB+, and the watch in A35 came later.
JSON: {"rating": "BBB+"}
csv+ontology run 4
BBB+. A36 downgraded Marlow (E14) to BBB+ on 2024-09-30, and nothing changed the rating before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+ontology run 5
BBB+. A36 (2024-09-30) downgraded it to BBB+, and A35 (2025-11-20) came later.
JSON: {"rating": "BBB+"}
csv+markdown run 1
BBB+. The downgrade A36 (2024-09-30) set it, and the watch in A35 came later.
JSON: {"rating": "BBB+"}
csv+markdown run 2
BBB+, set by A36 (DG, 2024-09-30).
JSON: {"rating": "BBB+"}
csv+markdown run 3
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36) and nothing changed it before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+markdown run 4
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30.
JSON: {"rating": "BBB+"}
csv+markdown run 5
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and A35 on 2025-11-20 was only a Watch.
JSON: {"rating": "BBB+"}
csv+padding run 1
BBB+. A36 downgraded E14 from A- to BBB+ on 2024-09-30.
JSON: {"rating": "BBB+"}
csv+padding run 2
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30.
JSON: {"rating": "BBB+"}
csv+padding run 3
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36).
JSON: {"rating": "BBB+"}
csv+padding run 4
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36).
JSON: {"rating": "BBB+"}
csv+padding run 5
BBB+. E14 was cut from A- to BBB+ on 2024-09-30 (A36), and the 2025-11-20 watch (A35) did not change the rating.
JSON: {"rating": "BBB+"}
executed run 1
BBB+ (A36).
JSON: {"rating": "BBB+"}
executed run 2
BBB+ (A36).
JSON: {"rating": "BBB+"}
executed run 3
BBB+ (A36).
JSON: {"rating": "BBB+"}
executed run 4
BBB+ (A36).
JSON: {"rating": "BBB+"}
executed run 5
BBB+. This is the rating in force from 2024-09-30 to 2025-11-20 (A36).
JSON: {"rating": "BBB+"}
csv+neutral run 1
BBB+. A36 (2024-09-30) downgraded E14 to BBB+, and nothing changed it before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+neutral run 2
BBB+. A36 downgraded Marlow to BBB+ on 2024-09-30, and nothing changed the rating before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+neutral run 3
BBB+. A36 downgraded Marlow to BBB+ on 2024-09-30, and no rating change followed before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+neutral run 4
BBB+. A36 (2024-09-30) downgraded E14 to BBB+, and the later A35 is only a watch.
JSON: {"rating": "BBB+"}
csv+neutral run 5
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the Watch in A35 only came later (2025-11-20).
JSON: {"rating": "BBB+"}
csv+axioms run 1
BBB+. A36 (2024-09-30) was in force on 2025-06-01.
JSON: {"rating": "BBB+"}
csv+axioms run 2
BBB+. A36 (2024-09-30) was the rating in force, and A35 only came on 2025-11-20.
JSON: {"rating": "BBB+"}
csv+axioms run 3
BBB+. A36 (2024-09-30) was in force on 1 Jun 2025.
JSON: {"rating": "BBB+"}
csv+axioms run 4
BBB+. A36 (2024-09-30) was in force on that date.
JSON: {"rating": "BBB+"}
csv+axioms run 5
BBB+. A36 downgraded it on 2024-09-30, and A35 (2025-11-20) came later.
JSON: {"rating": "BBB+"}
csv+axioms+markdown run 1
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the rating was unchanged on 2025-06-01.
JSON: {"rating": "BBB+"}
csv+axioms+markdown run 2
BBB+. The downgrade A36 (2024-09-30) set BBB+, and the later actions only placed it on Watch or affirmed it.
JSON: {"rating": "BBB+"}
csv+axioms+markdown run 3
BBB+, from A36 (a downgrade on 2024-09-30).
JSON: {"rating": "BBB+"}
csv+axioms+markdown run 4
BBB+. A36 (2024-09-30) is the latest action on or before 1 Jun 2025.
JSON: {"rating": "BBB+"}
csv+axioms+markdown run 5
BBB+. A36 downgraded E14 on 2024-09-30, and the later actions A35 and A33 do not change the rating level.
JSON: {"rating": "BBB+"}