Q1, run 2026-11-05-1227-sonnet

← back to the run

What was Kestrel Energy's rating on 1 January 2025?

Tests: Time: a rating holds from one action to the next, so 'the rating on a date' is the latest action on or before it.

Expected: rating = A-

✅ R1 csv run 1 graded by code

A-. A01 assigned A- on 2024-03-12 and A02 did not downgrade until 2025-06-20.

JSON: {"rating": "A-"}

✅ R1 csv run 2 graded by code

A-. A01 assigned A- on 2024-03-12 and nothing changed before 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R1 csv run 3 graded by code

A-. E01's rating was assigned as A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R1 csv run 4 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action, A02, is dated 2025-06-20.

JSON: {"rating": "A-"}

✅ R1 csv run 5 graded by code

A-. A01 assigned A- on 2024-03-12, and the next change (A02) came on 2025-06-20, so it stood on 2025-01-01.

JSON: {"rating": "A-"}

✅ R2 rdf run 1 graded by code

A-. E01's LTIDR was assigned A- on 2024-03-12 (A01), and the next action was 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R2 rdf run 2 graded by code

A-. A01 assigned E01 A- on 2024-03-12, and nothing changed it until A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R2 rdf run 3 graded by code

A-. E01 was assigned A- on 2024-03-12 (A01) and was not downgraded to BBB until 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R2 rdf run 4 graded by code

A-. E01's last action before that date was A01 (assigned A- on 2024-03-12), and A02 came later.

JSON: {"rating": "A-"}

✅ R2 rdf run 5 graded by code

A-. E01's rating was A- from A01 (2024-03-12) and was not changed until A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 1 graded by code

A-. E01's LTIDR was A- from A01 (2024-03-12) and was not changed until A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 2 graded by code

A-. E01's FC LTIDR was assigned A- on 2024-03-12 (A01) and not changed until the downgrade of 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 3 graded by code

A-. E01's long-term FC rating was set at A- by A01 (2024-03-12) and not changed until A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 4 graded by code

A-. E01's LTIDR (FC) was assigned A- in A01 on 2024-03-12 and stayed there until A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 5 graded by code

A-. E01's long-term foreign-currency rating was set at A- by A01 (2024-03-12) and held until A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 1 graded by code

A. The latest action on or before 1 Jan 2025 is A01 (2024-03-12), which assigned A- (not A). A02's downgrade to BBB only came in June 2025.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 2 graded by code

A-. A01 set A- on 2024-03-12, and the next action on E01 LTIDR (A02) was not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 3 graded by code

A-. A01 (2024-03-12) set A-, and the next action on E01's LTIDR (FC) is A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 4 graded by code

A-. A01 set A- on 2024-03-12, and the next action (A02) came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 5 graded by code

A-. A01 (2024-03-12) set A-, and the next action, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 1 graded by code

A-. A01 set Kestrel's FC LTIDR at A-, and the next action (A02) came in June 2025.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 2 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action on E01's FC LTIDR (A02) came in June 2025.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 3 graded by code

A-. E01's LTIDR FC was assigned A- on 2024-03-12 (A01), and the next action is dated 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 4 graded by code

A-. A01 (2024-03-12) set A-, and the next action, A02, is dated 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 5 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action on E01 LTIDR FC (A02) is not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 1 graded by code

A-. A01 assigned A- on 2024-03-12 and nothing changed it before 2025-01-01.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 2 graded by code

A-. A01 assigned A- to E01 on 2024-03-12, and it stayed until the downgrade A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 3 graded by code

A-. E01's LTIDR was assigned A- on 2024-03-12 (A01), and the next action is the 2025-06-20 downgrade (A02).

JSON: {"rating": "A-"}

✅ R3 csv+padding run 4 graded by code

A-. E01's LTIDR was assigned at A- (A01) and not changed until the 2025-06-20 downgrade (A02).

JSON: {"rating": "A-"}

✅ R3 csv+padding run 5 graded by code

A-. E01's LTIDR was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R10 executed run 1 graded by code

A-. Kestrel's foreign-currency LTIDR was A- from 2024-03-12 to 2025-06-20 (A01).

JSON: {"rating": "A-"}

✅ R10 executed run 2 graded by code

A-. E01's LTIDR was A- from 2024-03-12 to 2025-06-20 (A01).

JSON: {"rating": "A-"}

✅ R10 executed run 3 graded by code

A-. Kestrel's LTIDR FC was A- from 2024-03-12 to 2025-06-20 (A01).

JSON: {"rating": "A-"}

✅ R10 executed run 4 graded by code

A-. E01's LTIDR FC was A- from 2024-03-12 to 2025-06-20 (A01).

JSON: {"rating": "A-"}

✅ R10 executed run 5 graded by code

A-. E01's LTIDR FC was A- from 2024-03-12 to 2025-06-20 (A01).

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 1 graded by code

A-. E01's LTIDR (FC) was set to A- by A01 (2024-03-12). The next action, A02, was on 2025-06-20.

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 2 graded by code

A-. Kestrel's LTIDR was assigned A- on 2024-03-12 (A01), and the next action is dated 2025-06-20 (A02), after the question date.

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 3 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action (A02) is not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 4 graded by code

A-. A01 (2024-03-12) set E01's FC LTIDR at A-, and the next action, A02, is not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R7 csv+neutral run 5 graded by code

A-. A01 (2024-03-12) set E01's FC LTIDR at A-, and the next action, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 1 graded by code

A-. A01 assigned A- on 2024-03-12 and it ran until A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 2 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 3 graded by code

A-. A01 (2024-03-12) was still in force on 1 Jan 2025, because A02 only came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 4 graded by code

A-. Kestrel's LTIDR was A- from A01 (2024-03-12) until A02 (2025-06-20), so it was A- on 1 Jan 2025.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 5 graded by code

A-. A01 assigned A- on 2024-03-12, and it stayed in force until A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 1 graded by code

A-. The latest E01 LTIDR FC action on or before that date is A01 (A-), and A02 only came in June 2025.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 2 graded by code

A-. A01 assigned A- on 2024-03-12, and the next Kestrel action (A02) is not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 3 graded by code

A-. A01 assigned A- on 2024-03-12 and nothing changed it until A02 in June 2025.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 4 graded by code

A-. E01's latest LTIDR (FC) action on or before 1 Jan 2025 is A01 (2024-03-12), which assigned A-.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 5 graded by code

A-. E01's LTIDR FC was assigned A- on 2024-03-12 (A01), and nothing changed it until 2025-06-20.

JSON: {"rating": "A-"}