Q12, run 2026-11-04-2013-sonnet

← back to the run

What was Marlow Utilities' rating on 1 January 2024?

Tests: Time: the rating on a date before a later downgrade.

Expected: rating = A-

✅ R1 csv run 1 graded by code

A-. A34 assigned A- on 2023-01-15, before the A36 downgrade.

JSON: {"rating": "A-"}

✅ R1 csv run 2 graded by code

A-, from A34 (2023-01-15).

JSON: {"rating": "A-"}

✅ R1 csv run 3 graded by code

A-, from A34.

JSON: {"rating": "A-"}

✅ R1 csv run 4 graded by code

A-, from A34 (2023-01-15).

JSON: {"rating": "A-"}

✅ R1 csv run 5 graded by code

A-. A34 assigned A- on 2023-01-15.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 1 graded by code

A-. A34 (2023-01-15) set A-, and the downgrade came later.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 2 graded by code

A-, as assigned in A34 on 2023-01-15.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 3 graded by code

A-. A34 assigned A- on 2023-01-15, and the downgrade came later.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 4 graded by code

A-. A34 (2023-01-15) assigned A-, and the downgrade A36 came later.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 5 graded by code

A-. A34 (2023-01-15) set A-, and the downgrade A36 came later.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 1 graded by code

A-. A34 assigned A- on 2023-01-15, and the downgrade did not come until September 2024.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 2 graded by code

A-, from A34.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 3 graded by code

A-. A34 (2023-01-15) assigned A-, before the A36 downgrade.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 4 graded by code

A-, from A34.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 5 graded by code

A-, from A34.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 1 graded by code

A-. A34 (2023-01-15) was in force until A36.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 2 graded by code

A-. A34 assigned A- on 2023-01-15, and it was in force until A36.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 3 graded by code

A-. A34 assigned A- on 2023-01-15, and the downgrade A36 came later.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 4 graded by code

A-, from A34 (2023-01-15).

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 5 graded by code

A-. A34 was the only action in force on that date.

JSON: {"rating": "A-"}