Q11, run 2026-11-04-2013-sonnet

← back to the run

What was Marlow Utilities' rating on 1 June 2025?

Tests: Time: Marlow's actions are not in date order in the file.

Expected: rating = BBB+

✅ R1 csv run 1 graded by code

BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and A35 only placed it on watch.

JSON: {"rating": "BBB+"}

✅ R1 csv run 2 graded by code

BBB+. A36 downgraded it from A- to BBB+ on 2024-09-30, and the watch in A35 came later.

JSON: {"rating": "BBB+"}

✅ R1 csv run 3 graded by code

BBB+. A36 downgraded it on 2024-09-30, and A35 (2025-11-20) is later.

JSON: {"rating": "BBB+"}

✅ R1 csv run 4 graded by code

BBB+. Marlow was downgraded to BBB+ on 2024-09-30 (A36), and the watch added in A35 came later.

JSON: {"rating": "BBB+"}

✅ R1 csv run 5 graded by code

BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the later watch (A35) did not change the rating.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 1 graded by code

BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the later watch (A35) did not change it.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 2 graded by code

BBB+. The downgrade A36 (2024-09-30) applies, and the later actions are a watch and an affirmation.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 3 graded by code

BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the next action was on 2025-11-20.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 4 graded by code

BBB+. A36 (2024-09-30) downgraded E14 to BBB+, and the next action, A35 (2025-11-20), came after the date.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 5 graded by code

BBB+. A36 (2024-09-30) lowered it to BBB+, and A35 (2025-11-20) came after 1 June 2025.

JSON: {"rating": "BBB+"}

✅ R4 csv+markdown run 1 graded by code

BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and that held until the later watch and affirmation.

JSON: {"rating": "BBB+"}

✅ R4 csv+markdown run 2 graded by code

BBB+. The latest action on or before that date is A36 (2024-09-30).

JSON: {"rating": "BBB+"}

✅ R4 csv+markdown run 3 graded by code

BBB+. A36 (2024-09-30) downgraded E14 to BBB+, and the next action, A35, came later, on 2025-11-20.

JSON: {"rating": "BBB+"}

✅ R4 csv+markdown run 4 graded by code

BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the next action, A35 on 2025-11-20, is only a Watch.

JSON: {"rating": "BBB+"}

✅ R4 csv+markdown run 5 graded by code

BBB+. A36 downgraded E14 to BBB+ in Sep 2024, and A35 on 2025-11-20 falls after the query date.

JSON: {"rating": "BBB+"}

✅ R8 csv+axioms run 1 graded by code

BBB+. A36 (2024-09-30) was in force on that date.

JSON: {"rating": "BBB+"}

✅ R8 csv+axioms run 2 graded by code

BBB+. A36 downgraded it to BBB+ on 2024-09-30, and A35 (Rating Watch, 2025-11-20) came later.

JSON: {"rating": "BBB+"}

✅ R8 csv+axioms run 3 graded by code

BBB+. A36 downgraded Marlow on 2024-09-30 and nothing changed the rating before 2025-06-01.

JSON: {"rating": "BBB+"}

✅ R8 csv+axioms run 4 graded by code

BBB+. A36 downgraded Marlow to BBB+ on 2024-09-30, and A35 (the watch) came later.

JSON: {"rating": "BBB+"}

✅ R8 csv+axioms run 5 graded by code

BBB+. A36 downgraded Marlow to BBB+ on 2024-09-30, and A35 (2025-11-20) came later.

JSON: {"rating": "BBB+"}