Q1, run 2026-11-04-2013-sonnet
What was Kestrel Energy's rating on 1 January 2025?
Tests: Time: a rating holds from one action to the next, so 'the rating on a date' is the latest action on or before it.
Expected: rating = A-
csv run 1
A-. A01 assigned A- on 2024-03-12 and nothing changed until A02 on 2025-06-20.
JSON: {"rating": "A-"}
csv run 2
A-. A01 assigned A- on 2024-03-12, and the next action (A02) is dated 2025-06-20.
JSON: {"rating": "A-"}
csv run 3
A-. A01 assigned A- on 2024-03-12, and the next action, A02, is dated 2025-06-20.
JSON: {"rating": "A-"}
csv run 4
A-. Kestrel's LTIDR was assigned A- on 2024-03-12 (A01) and not changed until the 2025-06-20 downgrade (A02).
JSON: {"rating": "A-"}
csv run 5
A-. A01 assigned A- on 2024-03-12 and nothing changed it before 2025-01-01.
JSON: {"rating": "A-"}
csv+ontology run 1
A-. Action A01 (2024-03-12) set A- and the next action, A02, came on 2025-06-20.
JSON: {"rating": "A-"}
csv+ontology run 2
A-. E01's LTIDR FC was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv+ontology run 3
A-. A01 set E01's foreign-currency LTIDR at A- on 2024-03-12, and the next action (A02) came only on 2025-06-20.
JSON: {"rating": "A-"}
csv+ontology run 4
A-. The latest action on or before 2025-01-01 is A01 (2024-03-12, A- FC), and A02 only came in June 2025.
JSON: {"rating": "A-"}
csv+ontology run 5
A-. A01 (2024-03-12) set A-, and the next action on E01 LTIDR FC, A02, came on 2025-06-20.
JSON: {"rating": "A-"}
csv+markdown run 1
A-. A01 assigned A- on 2024-03-12, and the next action on E01's LTIDR (A02) came only in June 2025.
JSON: {"rating": "A-"}
csv+markdown run 2
A-. Action A01 (2024-03-12) set E01's FC LTIDR at A-, and the next action, A02, came on 2025-06-20.
JSON: {"rating": "A-"}
csv+markdown run 3
A-. A01 (2024-03-12) set E01's FC LTIDR at A-, and the next action, A02, is dated 2025-06-20.
JSON: {"rating": "A-"}
csv+markdown run 4
A-. A01 assigned A- to E01 on 2024-03-12, and the next action, A02, was not until 2025-06-20.
JSON: {"rating": "A-"}
csv+markdown run 5
BBB+... correction: A-. Kestrel's rating on 1 Jan 2025 was A-, set by A01 (Mar 2024) and not changed until the downgrade in A02 (Jun 2025).
JSON: {"rating": "A-"}
csv+axioms run 1
A-. A01 (assigned 2024-03-12) was the rating in force until A02 on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms run 2
A-. A01 assigned A- on 2024-03-12, and it stayed in force until the A02 downgrade on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms run 3
A-. A01 assigned A- on 2024-03-12, and the next action, A02, came on 2025-06-20, after the date asked.
JSON: {"rating": "A-"}
csv+axioms run 4
A-. A01 assigned A- in March 2024, and the downgrade to BBB (A02) only came on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms run 5
A-. A01 assigned A- on 2024-03-12, and the next LTIDR action (A02) only came on 2025-06-20.
JSON: {"rating": "A-"}