Q1, run 2026-11-04-2013-sonnet

← back to the run

What was Kestrel Energy's rating on 1 January 2025?

Tests: Time: a rating holds from one action to the next, so 'the rating on a date' is the latest action on or before it.

Expected: rating = A-

✅ R1 csv run 1 graded by code

A-. A01 assigned A- on 2024-03-12 and nothing changed until A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R1 csv run 2 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action (A02) is dated 2025-06-20.

JSON: {"rating": "A-"}

✅ R1 csv run 3 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action, A02, is dated 2025-06-20.

JSON: {"rating": "A-"}

✅ R1 csv run 4 graded by code

A-. Kestrel's LTIDR was assigned A- on 2024-03-12 (A01) and not changed until the 2025-06-20 downgrade (A02).

JSON: {"rating": "A-"}

✅ R1 csv run 5 graded by code

A-. A01 assigned A- on 2024-03-12 and nothing changed it before 2025-01-01.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 1 graded by code

A-. Action A01 (2024-03-12) set A- and the next action, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 2 graded by code

A-. E01's LTIDR FC was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 3 graded by code

A-. A01 set E01's foreign-currency LTIDR at A- on 2024-03-12, and the next action (A02) came only on 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 4 graded by code

A-. The latest action on or before 2025-01-01 is A01 (2024-03-12, A- FC), and A02 only came in June 2025.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 5 graded by code

A-. A01 (2024-03-12) set A-, and the next action on E01 LTIDR FC, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 1 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action on E01's LTIDR (A02) came only in June 2025.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 2 graded by code

A-. Action A01 (2024-03-12) set E01's FC LTIDR at A-, and the next action, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 3 graded by code

A-. A01 (2024-03-12) set E01's FC LTIDR at A-, and the next action, A02, is dated 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 4 graded by code

A-. A01 assigned A- to E01 on 2024-03-12, and the next action, A02, was not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 5 graded by code

BBB+... correction: A-. Kestrel's rating on 1 Jan 2025 was A-, set by A01 (Mar 2024) and not changed until the downgrade in A02 (Jun 2025).

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 1 graded by code

A-. A01 (assigned 2024-03-12) was the rating in force until A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 2 graded by code

A-. A01 assigned A- on 2024-03-12, and it stayed in force until the A02 downgrade on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 3 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action, A02, came on 2025-06-20, after the date asked.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 4 graded by code

A-. A01 assigned A- in March 2024, and the downgrade to BBB (A02) only came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 5 graded by code

A-. A01 assigned A- on 2024-03-12, and the next LTIDR action (A02) only came on 2025-06-20.

JSON: {"rating": "A-"}