Q11, run 2026-11-04-1825-sonnet

← back to the run

What was Marlow Utilities' rating on 1 June 2025?

Tests: Time: Marlow's actions are not in date order in the file.

Expected: rating = BBB+

✅ R1 csv run 1 graded by code

BBB+. Marlow was downgraded to BBB+ on 2024-09-30 (A36), and the later action on 2025-11-20 (A35) was after this date.

JSON: {"rating": "BBB+"}

✅ R1 csv run 2 graded by code

BBB+. A36 downgraded E14 from A- to BBB+ on 2024-09-30.

JSON: {"rating": "BBB+"}

✅ R1 csv run 3 graded by code

BBB+. A36 downgraded it from A- on 2024-09-30. The RWN in A35 came later and did not change the rating.

JSON: {"rating": "BBB+"}

✅ R1 csv run 4 graded by code

BBB+. A36 downgraded Marlow from A- on 2024-09-30.

JSON: {"rating": "BBB+"}

✅ R1 csv run 5 graded by code

BBB+. A36 downgraded E14 from A- to BBB+ on 2024-09-30, and A35 (2025-11-20) is only a watch.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 1 graded by code

BBB+. A36 downgraded E14 from A- to BBB+ on 2024-09-30, and A35 (a Watch) did not change it.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 2 graded by code

BBB+. A36 (2024-09-30) is the latest action on or before that date.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 3 graded by code

BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the next action (A35) is on 2025-11-20.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 4 graded by code

BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the next action (A35) was after 2025-06-01.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 5 graded by code

BBB+. The downgrade on 2024-09-30 (A36) still held on 2025-06-01.

JSON: {"rating": "BBB+"}

✅ R8 csv+axioms run 1 graded by code

BBB+. A36 (2024-09-30) was in force until A35 on 2025-11-20.

JSON: {"rating": "BBB+"}

✅ R8 csv+axioms run 2 graded by code

BBB+. A36 downgraded E14 from A- to BBB+ on 2024-09-30, and nothing changed it by 2025-06-01.

JSON: {"rating": "BBB+"}

✅ R8 csv+axioms run 3 graded by code

BBB+. A36 downgraded E14 from A- on 2024-09-30, and A35, a watch, came later in 2025-11.

JSON: {"rating": "BBB+"}

✅ R8 csv+axioms run 4 graded by code

BBB+. A36 (2024-09-30) downgraded it to BBB+.

JSON: {"rating": "BBB+"}

✅ R8 csv+axioms run 5 graded by code

BBB+. A36 downgraded Marlow to BBB+ on 2024-09-30, and it stayed in force on 2025-06-01.

JSON: {"rating": "BBB+"}

✅ R9 csv+axioms+markdown run 1 graded by code

BBB+. A36 downgraded E14 on 2024-09-30, and the watch in A35 left the rating unchanged.

JSON: {"rating": "BBB+"}

✅ R9 csv+axioms+markdown run 2 graded by code

BBB+. The downgrade A36 (2024-09-30) was in force on that date.

JSON: {"rating": "BBB+"}

✅ R9 csv+axioms+markdown run 3 graded by code

BBB+. The downgrade A36 (2024-09-30) set BBB+, and the next action is on 2025-11-20.

JSON: {"rating": "BBB+"}

✅ R9 csv+axioms+markdown run 4 graded by code

BBB+. A36 (2024-09-30) set it, and the Watch in A35 came later.

JSON: {"rating": "BBB+"}

✅ R9 csv+axioms+markdown run 5 graded by code

BBB+. A36 downgraded E14 to BBB+ on 2024-09-30.

JSON: {"rating": "BBB+"}