Q1, run 2026-11-04-1825-sonnet

← back to the run

What was Kestrel Energy's rating on 1 January 2025?

Tests: Time: a rating holds from one action to the next, so 'the rating on a date' is the latest action on or before it.

Expected: rating = A-

✅ R1 csv run 1 graded by code

A-. Kestrel's LTIDR was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R1 csv run 2 graded by code

A-. A01 assigned E01 A- on 2024-03-12, and nothing changed it before 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R1 csv run 3 graded by code

A-. A01 assigned A- on 2024-03-12, and A02 did not lower it until 2025-06-20.

JSON: {"rating": "A-"}

✅ R1 csv run 4 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R1 csv run 5 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action on E01 (A02) came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 1 graded by code

A-. The latest action on or before that date is A01 (A-, 2024-03-12); the downgrade A02 came in June 2025.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 2 graded by code

A-. A01 set E01's foreign-currency long-term rating at A- on 2024-03-12, and the next action (A02) is not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 3 graded by code

A-. A01 assigned A- on 2024-03-12, and the next E01 LTIDR action (A02) is not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 4 graded by code

A-. A01 set E01's FC LTIDR at A- on 2024-03-12, and the next action (A02) was on 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 5 graded by code

A-. E01's LTIDR FC was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 1 graded by code

A-. A01 assigned A- on 2024-03-12 and nothing changed until the downgrade A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 2 graded by code

A-. E01's LTIDR was assigned A- (A01) and not changed until the June 2025 downgrade (A02).

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 3 graded by code

A-. A01 assigned A- on 2024-03-12, and it stayed in force until A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 4 graded by code

A-. A01 assigned A- on 2024-03-12 and nothing changed it until A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 5 graded by code

A-. Kestrel's A- assigned on 2024-03-12 (A01) was still in force on that date. The downgrade to BBB came later, on 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 1 graded by code

A-. E01's LTIDR (FC) was A- from A01 (2024-03-12) until the downgrade A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 2 graded by code

A-. A01 (2024-03-12) set A-, and the next change, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 3 graded by code

A-. E01's FC LTIDR was A- from A01 (2024-03-12) until the downgrade A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 4 graded by code

A-. E01's LTIDR FC was A- from A01 (2024-03-12) until A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 5 graded by code

A-. E01's FC LTIDR was A- from A01 (2024-03-12) until A02 (2025-06-20).

JSON: {"rating": "A-"}