Q1, run 2026-11-04-1825-sonnet
What was Kestrel Energy's rating on 1 January 2025?
Tests: Time: a rating holds from one action to the next, so 'the rating on a date' is the latest action on or before it.
Expected: rating = A-
csv run 1
A-. Kestrel's LTIDR was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv run 2
A-. A01 assigned E01 A- on 2024-03-12, and nothing changed it before 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv run 3
A-. A01 assigned A- on 2024-03-12, and A02 did not lower it until 2025-06-20.
JSON: {"rating": "A-"}
csv run 4
A-. A01 assigned A- on 2024-03-12, and the next action, A02, came on 2025-06-20.
JSON: {"rating": "A-"}
csv run 5
A-. A01 assigned A- on 2024-03-12, and the next action on E01 (A02) came on 2025-06-20.
JSON: {"rating": "A-"}
csv+ontology run 1
A-. The latest action on or before that date is A01 (A-, 2024-03-12); the downgrade A02 came in June 2025.
JSON: {"rating": "A-"}
csv+ontology run 2
A-. A01 set E01's foreign-currency long-term rating at A- on 2024-03-12, and the next action (A02) is not until 2025-06-20.
JSON: {"rating": "A-"}
csv+ontology run 3
A-. A01 assigned A- on 2024-03-12, and the next E01 LTIDR action (A02) is not until 2025-06-20.
JSON: {"rating": "A-"}
csv+ontology run 4
A-. A01 set E01's FC LTIDR at A- on 2024-03-12, and the next action (A02) was on 2025-06-20.
JSON: {"rating": "A-"}
csv+ontology run 5
A-. E01's LTIDR FC was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv+axioms run 1
A-. A01 assigned A- on 2024-03-12 and nothing changed until the downgrade A02 on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms run 2
A-. E01's LTIDR was assigned A- (A01) and not changed until the June 2025 downgrade (A02).
JSON: {"rating": "A-"}
csv+axioms run 3
A-. A01 assigned A- on 2024-03-12, and it stayed in force until A02 on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms run 4
A-. A01 assigned A- on 2024-03-12 and nothing changed it until A02 on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms run 5
A-. Kestrel's A- assigned on 2024-03-12 (A01) was still in force on that date. The downgrade to BBB came later, on 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv+axioms+markdown run 1
A-. E01's LTIDR (FC) was A- from A01 (2024-03-12) until the downgrade A02 on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms+markdown run 2
A-. A01 (2024-03-12) set A-, and the next change, A02, came on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms+markdown run 3
A-. E01's FC LTIDR was A- from A01 (2024-03-12) until the downgrade A02 on 2025-06-20.
JSON: {"rating": "A-"}
csv+axioms+markdown run 4
A-. E01's LTIDR FC was A- from A01 (2024-03-12) until A02 (2025-06-20).
JSON: {"rating": "A-"}
csv+axioms+markdown run 5
A-. E01's FC LTIDR was A- from A01 (2024-03-12) until A02 (2025-06-20).
JSON: {"rating": "A-"}