Q12, run 2026-11-04-1824-haiku

← back to the run

What was Marlow Utilities' rating on 1 January 2024?

Tests: Time: the rating on a date before a later downgrade.

Expected: rating = A-

✅ R1 csv run 1 graded by code

A-. The rating was assigned as A- on 2023-01-15 (A34) and was unchanged until the 2024-09-30 downgrade (A36).

JSON: {"rating": "A-"}

✅ R1 csv run 2 graded by code

A-. A34 assigned A- on 2023-01-15, and the next action (A36) came on 2024-09-30.

JSON: {"rating": "A-"}

✅ R1 csv run 3 graded by code

A-. A34 (2023-01-15) assigned A- and no later action applies on 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R1 csv run 4 graded by code

A-. This was the rating assigned on 2023-01-15 (A34), with no change before 2024-09-30.

JSON: {"rating": "A-"}

✅ R1 csv run 5 graded by code

A-. A34 (2023-01-15) is the latest rating before 2024-01-01.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 1 graded by code

None. The first action on E12 is A30 (2024-02-01), and E14's earliest action is A34 (2023-01-15) at A-, so the question concerns E14. Its rating on 2024-01-01 was A-, from A34.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 2 graded by code

A-. E14's rating on 2024-01-01 was the assigned A- (A34, 2023-01-15).

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 3 graded by code

A-. This is the rating set by A34 (2023-01-15), since the downgrade came later on 2024-09-30 (A36).

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 4 graded by code

A-.
E14's latest action before 1 Jan 2024 is A34 (assigned A-, 2023-01-15).

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 5 graded by code

A-. A34 (2023-01-15) is the latest action before 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 1 graded by code

A-. E14's A34 (2023-01-15) was in force until A36 superseded it on 2024-09-30.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 2 graded by code

A-
A34 (A-, 2023-01-15) was in force until A36 on 2024-09-30.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 3 graded by code

A-. This was the rating from A34 (2023-01-15), before the 2024-09-30 downgrade.

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 4 graded by code

A-
E14's A34 (A-, 2023-01-15) was the rating until A36 (2024-09-30).

JSON: {"rating": "A-"}

✅ R8 csv+axioms run 5 graded by code

A-. Marlow's A- (A34) was in force until 2024-09-30 (A36).

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 1 graded by code

A-. Marlow Utilities was assigned A- on 2023-01-15 (A34), and the first change came on 2024-09-30 (A36).

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 2 graded by code

A-. Only action on or before 2024-01-01 is A34 (AS, 2023-01-15).

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 3 graded by code

A-. The only action on or before 1 Jan 2024 is A34 (assigned A-, 2023-01-15). A36 came later.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 4 graded by code

A-. A34 (AS, A-, 2023-01-15) holds until A36 on 2024-09-30.

JSON: {"rating": "A-"}

✅ R9 csv+axioms+markdown run 5 graded by code

A-
The only action on or before 2024-01-01 is the 2023-01-15 assignment of A- (A34).

JSON: {"rating": "A-"}