Q12, run 2026-11-04-1711-sonnet
What was Marlow Utilities' rating on 1 January 2024?
Tests: Time: the rating on a date before a later downgrade.
Expected: rating = A-
csv run 1
A-. A34 assigned A- on 2023-01-15, before A36.
JSON: {"rating": "A-"}
csv run 2
A-, from A34 (2023-01-15).
JSON: {"rating": "A-"}
csv run 3
A- (A34, assigned 2023-01-15).
JSON: {"rating": "A-"}
csv run 4
A-. A34 (2023-01-15) was still in force.
JSON: {"rating": "A-"}
csv run 5
A-, per A34.
JSON: {"rating": "A-"}
rdf run 1
A-, from A34 (2023-01-15).
JSON: {"rating": "A-"}
rdf run 2
A-. A34 (2023-01-15) was still current on 2024-01-01.
JSON: {"rating": "A-"}
rdf run 3
A-. A34 (2023-01-15) applies until A36.
JSON: {"rating": "A-"}
rdf run 4
A-. This is from A34, assigned 2023-01-15, before the downgrade.
JSON: {"rating": "A-"}
rdf run 5
A-, from A34 (2023-01-15).
JSON: {"rating": "A-"}
rdf+ontology run 1
A-. A34 assigned A- on 2023-01-15.
JSON: {"rating": "A-"}
rdf+ontology run 2
A-. It was assigned on 2023-01-15 (A34), before the downgrade.
JSON: {"rating": "A-"}
rdf+ontology run 3
A-, from A34 (2023-01-15).
JSON: {"rating": "A-"}
rdf+ontology run 4
A-. A34 (2023-01-15) was still in force on 2024-01-01.
JSON: {"rating": "A-"}
rdf+ontology run 5
A-, from A34.
JSON: {"rating": "A-"}
csv+ontology run 1
A-. On 2024-01-01 only A34 (2023-01-15, A-) had been made.
JSON: {"rating": "A-"}
csv+ontology run 2
A-, from A34.
JSON: {"rating": "A-"}
csv+ontology run 3
A-, from A34 (2023-01-15).
JSON: {"rating": "A-"}
csv+ontology run 4
A-. A34 assigned A- on 2023-01-15, and the downgrade did not come until 2024-09-30.
JSON: {"rating": "A-"}
csv+ontology run 5
A-, from A34.
JSON: {"rating": "A-"}
csv+markdown run 1
A-. A34 (2023-01-15) holds until A36.
JSON: {"rating": "A-"}
csv+markdown run 2
A-. A34 assigned A- on 2023-01-15, before the A36 downgrade.
JSON: {"rating": "A-"}
csv+markdown run 3
A-, from A34 (2023-01-15).
JSON: {"rating": "A-"}
csv+markdown run 4
A- (A34).
JSON: {"rating": "A-"}
csv+markdown run 5
A-. A34 assigned A- on 2023-01-15, before the A36 downgrade.
JSON: {"rating": "A-"}
csv+padding run 1
A-. This is E14's rating from A34, assigned 2023-01-15.
JSON: {"rating": "A-"}
csv+padding run 2
A-. This is A34, assigned 2023-01-15.
JSON: {"rating": "A-"}
csv+padding run 3
A-, from A34.
JSON: {"rating": "A-"}
csv+padding run 4
A-, from A34 (2023-01-15).
JSON: {"rating": "A-"}
csv+padding run 5
A-. E14 was assigned A- on 2023-01-15 (A34).
JSON: {"rating": "A-"}