Q11, run 2026-11-04-1711-sonnet
What was Marlow Utilities' rating on 1 June 2025?
Tests: Time: Marlow's actions are not in date order in the file.
Expected: rating = BBB+
csv run 1
BBB+. The downgrade in A36 (2024-09-30) predates this date, and the next action is A35 in November 2025.
JSON: {"rating": "BBB+"}
csv run 2
BBB+. A36 (2024-09-30) downgraded Marlow to BBB+, and A35 (2025-11-20) came later.
JSON: {"rating": "BBB+"}
csv run 3
BBB+. The downgrade from A- (A34) to BBB+ came on 2024-09-30 (A36), and the next action is 2025-11-20.
JSON: {"rating": "BBB+"}
csv run 4
BBB+. A36 (2024-09-30) downgraded E14 from A-, and A35 only came later, in November 2025.
JSON: {"rating": "BBB+"}
csv run 5
BBB+. A36 downgraded E14 from A- to BBB+ on 2024-09-30.
JSON: {"rating": "BBB+"}
rdf run 1
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the next action was on 2025-11-20.
JSON: {"rating": "BBB+"}
rdf run 2
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and A35 (a watch action, 2025-11-20) comes later.
JSON: {"rating": "BBB+"}
rdf run 3
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and A35 only placed it on watch in November 2025.
JSON: {"rating": "BBB+"}
rdf run 4
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the next action (A35) came in November 2025.
JSON: {"rating": "BBB+"}
rdf run 5
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36) and was unchanged on 2025-06-01.
JSON: {"rating": "BBB+"}
rdf+ontology run 1
BBB+. A36 (2024-09-30) downgraded E14 to BBB+, and the next action, A35, is only a Watch.
JSON: {"rating": "BBB+"}
rdf+ontology run 2
BBB+. E14 was downgraded on 2024-09-30 (A36), and the Watch on 2025-11-20 (A35) came later.
JSON: {"rating": "BBB+"}
rdf+ontology run 3
BBB+. A36 downgraded E14 on 2024-09-30, and the next action was A35 on 2025-11-20.
JSON: {"rating": "BBB+"}
rdf+ontology run 4
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and A35 (2025-11-20) is later.
JSON: {"rating": "BBB+"}
rdf+ontology run 5
BBB+, from A36 (DG, 2024-09-30). The RW in A35 came later.
JSON: {"rating": "BBB+"}
csv+ontology run 1
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the later actions (A35, A33) leave it unchanged.
JSON: {"rating": "BBB+"}
csv+ontology run 2
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the next action came on 2025-11-20.
JSON: {"rating": "BBB+"}
csv+ontology run 3
BBB+. A36 (2024-09-30) downgraded Marlow (E14) to BBB+, and A35 only placed it on Watch.
JSON: {"rating": "BBB+"}
csv+ontology run 4
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the later actions (A35, A33) left it unchanged.
JSON: {"rating": "BBB+"}
csv+ontology run 5
BBB+. A36 downgraded it on 2024-09-30; the Watch in A35 came later.
JSON: {"rating": "BBB+"}
csv+markdown run 1
BBB+. A36 (2024-09-30) downgraded it to BBB+, and the next action is A35 in November 2025.
JSON: {"rating": "BBB+"}
csv+markdown run 2
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the next action came after 2025-06-01.
JSON: {"rating": "BBB+"}
csv+markdown run 3
BBB+. A36 (2024-09-30) downgraded E14 to BBB+, and A35 is only a Watch.
JSON: {"rating": "BBB+"}
csv+markdown run 4
BBB+ (A36, a downgrade on 2024-09-30).
JSON: {"rating": "BBB+"}
csv+markdown run 5
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the next action (A35) is dated 2025-11-20.
JSON: {"rating": "BBB+"}
csv+padding run 1
BBB+. E14 was downgraded from A- to BBB+ on 2024-09-30 (A36).
JSON: {"rating": "BBB+"}
csv+padding run 2
BBB+. A36 downgraded E14 from A- to BBB+ on 2024-09-30.
JSON: {"rating": "BBB+"}
csv+padding run 3
BBB+. A36 (2024-09-30) downgraded Marlow to BBB+, and the RWN in A35 only came on 2025-11-20.
JSON: {"rating": "BBB+"}
csv+padding run 4
BBB+. E14 was downgraded from A- to BBB+ on 2024-09-30 (A36), and the later actions A35 and A33 kept BBB+.
JSON: {"rating": "BBB+"}
csv+padding run 5
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the later actions A35 and A33 kept it there.
JSON: {"rating": "BBB+"}