Q1, run 2026-11-04-1711-sonnet

← back to the run

What was Kestrel Energy's rating on 1 January 2025?

Tests: Time: a rating holds from one action to the next, so 'the rating on a date' is the latest action on or before it.

Expected: rating = A-

✅ R1 csv run 1 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action (A02) came in June 2025.

JSON: {"rating": "A-"}

✅ R1 csv run 2 graded by code

A-. A01 (2024-03-12) assigned A-, and the next action, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R1 csv run 3 graded by code

A-. Kestrel's LTIDR was assigned A- on 2024-03-12 (A01) and unchanged until 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R1 csv run 4 graded by code

A-. E01's last action before that date was A01 (2024-03-12, A-); the downgrade A02 came in June 2025.

JSON: {"rating": "A-"}

✅ R1 csv run 5 graded by code

A-. A01 assigned A- on 2024-03-12 and nothing changed it until A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R2 rdf run 1 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action for E01 was A02 on 2025-06-20.

JSON: {"rating": "A-"}

✅ R2 rdf run 2 graded by code

A-. E01's latest rating before 1 Jan 2025 is A01 (A- LTIDR, FC, 2024-03-12). The downgrade to BBB (A02) came later, in June 2025.

JSON: {"rating": "A-"}

✅ R2 rdf run 3 graded by code

A-. E01's LTIDR was A- from A01 (2024-03-12) and stayed so until the downgrade in A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R2 rdf run 4 graded by code

A-. E01's last action before that date was A01, an assignment of A- on 2024-03-12. The downgrade to BBB (A02) came in June 2025.

JSON: {"rating": "A-"}

✅ R2 rdf run 5 graded by code

A-. E01's latest action on or before that date is A01, assigned A- on 2024-03-12. The downgrade to BBB (A02) came later, in June 2025.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 1 graded by code

A-. E01's foreign-currency long-term rating was set to A- by A01 (2024-03-12). It did not change until A02 in 2025-06.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 2 graded by code

A-. E01's FC long-term IDR was assigned A- on 2024-03-12 (A01), and the next action came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 3 graded by code

A-. E01's foreign-currency long-term rating was A- from A01 (2024-03-12), and nothing changed until 2026.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 4 graded by code

A-. A01 (assigned 2024-03-12) was the latest E01 long-term foreign-currency action before 2025-01-01; the next, A02, is dated 2025-06-20.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 5 graded by code

A-. E01's LTIDR (FC) was A- from A01 (2024-03-12) until A02 (2025-06-20).

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 1 graded by code

A-. A01 (2024-03-12) set A- for E01, and the next action, A02, is not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 2 graded by code

A-. A01 set A- on 2024-03-12, and the next action on E01's FC LTIDR (A02) came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 3 graded by code

A-. A01 (2024-03-12) set A-, and the next action, A02, is not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 4 graded by code

A-. E01's LTIDR (FC) was set to A- by A01 (2024-03-12), and the next action, A02, is not until 2025-06-20.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 5 graded by code

A-. A01 assigned A- on 2024-03-12, and the next Kestrel action (A02) came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 1 graded by code

A-. The latest action on or before 1 Jan 2025 is A01 (2024-03-12, A-), before the downgrade A02.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 2 graded by code

A-. A01 set A- for E01 on 2024-03-12, and the next LTIDR action, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 3 graded by code

A-. A01 (2024-03-12) set E01 at A-, and the next action, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 4 graded by code

A-. A01 (2024-03-12) set A-, and the next LTIDR FC action, A02, only came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 5 graded by code

A-. A01 set A- on 2024-03-12, and the next action (A02) came only on 2025-06-20.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 1 graded by code

A-. E01's LTIDR was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).

JSON: {"rating": "A-"}

✅ R3 csv+padding run 2 graded by code

A-. A01 assigned A- on 2024-03-12, and the next action on E01 (A02) came in June 2025.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 3 graded by code

A-. A01 (2024-03-12) set Kestrel's LTIDR at A-, and the next action, A02, came on 2025-06-20.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 4 graded by code

A-. E01's last action before 2025-01-01 was A01 (assigned A-, 2024-03-12); the downgrade to BBB (A02) came in June 2025.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 5 graded by code

A-. E01's rating was assigned at A- on 2024-03-12 (A01) and not cut until 2025-06-20 (A02).

JSON: {"rating": "A-"}