Q12, run 2026-11-04-1644-haiku

← back to the run

What was Marlow Utilities' rating on 1 January 2024?

Tests: Time: the rating on a date before a later downgrade.

Expected: rating = A-

✅ R1 csv run 1 graded by code

A-. The rating was assigned at A- on 2023-01-15 (A34), and the first change came on 2024-09-30 (A36).

JSON: {"rating": "A-"}

✅ R1 csv run 2 graded by code

A-. This is the rating set on 2023-01-15 (A34), and no action came before 1 January 2024.

JSON: {"rating": "A-"}

✅ R1 csv run 3 graded by code

A-. A34 (2023-01-15) was the rating in effect on 2024-01-01.

JSON: {"rating": "A-"}

✅ R1 csv run 4 graded by code

A-. A34 (2023-01-15) assigned A-, and the first downgrade, A36, came on 2024-09-30.

JSON: {"rating": "A-"}

✅ R1 csv run 5 graded by code

A-. This was the rating from A34 (2023-01-15), before the 2024-09-30 downgrade.

JSON: {"rating": "A-"}

✅ R2 rdf run 1 graded by code

A-
The latest rating before 1 Jan 2024 is A34 (A-, 2023-01-15), with no action until A36.

JSON: {"rating": "A-"}

✅ R2 rdf run 2 graded by code

A-. A34 (AS A-, 2023-01-15) was the rating then, and A36 came later.

JSON: {"rating": "A-"}

✅ R2 rdf run 3 graded by code

A-. A34 (2023-01-15) was the rating on 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R2 rdf run 4 graded by code

A-. A34 (A-, 2023-01-15) was in force until the 2024-09-30 downgrade (A36).

JSON: {"rating": "A-"}

✅ R2 rdf run 5 graded by code

A-
Marlow's rating before its first downgrade was A- (A34, 2023-01-15).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 1 graded by code

A-. A34 (2023-01-15) is the only earlier action.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 2 graded by code

A-.
E14's A34 (A-, 2023-01-15) was the rating in force on 2024-01-01; A36 came later.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 3 graded by code

A-. Only A34 (AS, 2023-01-15) precedes 2024-01-01.

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 4 graded by code

A-. The only action on or before 2024-01-01 is A34 (AS A-, 2023-01-15).

JSON: {"rating": "A-"}

✅ R6 rdf+ontology run 5 graded by code

A-. This was set by A34 (2023-01-15), before A36 changed it on 2024-09-30.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 1 graded by code

A-. The rating was assigned as A- on 2023-01-15 (A34), and the next action is dated 2024-09-30 (A36).

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 2 graded by code

A-. A34 (AS, 2023-01-15) was the latest action before 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 3 graded by code

A-. The latest action before 1 January 2024 was the assignment at A- (A34, 2023-01-15).

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 4 graded by code

A-. This is the rating assigned on 2023-01-15 (A34), the latest action on or before that date.

JSON: {"rating": "A-"}

✅ R5 csv+ontology run 5 graded by code

A-
The only action before 2024-01-01 is A34 (AS, A-, 2023-01-15).

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 1 graded by code

A-. A34 (2023-01-15) assigned A-, and the first later action is A36 (2024-09-30).

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 2 graded by code

A-. Marlow's rating on 1 Jan 2024 is A- from A34 (2023-01-15).

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 3 graded by code

A-. The only E14 action before 1 Jan 2024 is the assignment A34 (15 Jan 2023).

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 4 graded by code

A-. E14's first assignment (A34, 2023-01-15) gave A-, and no action preceded 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R4 csv+markdown run 5 graded by code

A-. A34 (2023-01-15) is the latest action before 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 1 graded by code

A-. This was the rating from 2023-01-15 (A34), before the 2024 downgrade.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 2 graded by code

A-. A34 (2023-01-15) set A-, and the downgrade in A36 came after 1 Jan 2024.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 3 graded by code

A-. A34 (2023-01-15) assigned A-, and the next action (A36) was on 2024-09-30.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 4 graded by code

A-. A34 (2023-01-15) assigned A-, and the next action, A36, came on 2024-09-30.

JSON: {"rating": "A-"}

✅ R3 csv+padding run 5 graded by code

A-. This was assigned on 2023-01-15 (A34), and no action came before 2024-01-01.

JSON: {"rating": "A-"}