What was Marlow Utilities' rating on 1 June 2025?

Tests: Time: Marlow's actions are not in date order in the file.

Expected: rating = BBB+

✅ R1 csv run 1 graded by code

BBB+. Marlow Utilities (E14) was downgraded from A- to BBB+ on 2024-09-30 (A36), and that was still its rating on 2025-06-01.

JSON: {"rating": "BBB+"}

✅ R1 csv run 2 graded by code

BBB+. The downgrade to BBB+ took effect on 2024-09-30 (A36), and the later RW (A35) didn't change the rating.

JSON: {"rating": "BBB+"}

✅ R1 csv run 3 graded by code

BBB+. A36 (2024-09-30, DG to BBB+) was in effect on 2025-06-01.

JSON: {"rating": "BBB+"}

✅ R1 csv run 4 graded by code

BBB+. A36 (2024-09-30) set BBB+, and no rating change occurred until the later A35 (2025-11-20), which was a watch placement.

JSON: {"rating": "BBB+"}

✅ R1 csv run 5 graded by code

BBB+. The downgrade from A- to BBB+ on 2024-09-30 (A36) was still in effect on 1 Jun 2025.

JSON: {"rating": "BBB+"}

✅ R2 rdf run 1 graded by code

BBB+
A36 (2024-09-30) sets E14 at BBB+, and it stays there until A35 (watch, 2025-11-20).

JSON: {"rating": "BBB+"}

✅ R2 rdf run 2 graded by code

BBB+. The downgrade to BBB+ (A36) took effect 2024-09-30, before 2025-06-01.

JSON: {"rating": "BBB+"}

✅ R2 rdf run 3 graded by code

BBB+. The latest rating before 1 Jun 2025 is BBB+ from A36 (2024-09-30).

JSON: {"rating": "BBB+"}

✅ R2 rdf run 4 graded by code

BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36) and the next action is the watch placement on 2025-11-20 (A35).

JSON: {"rating": "BBB+"}

✅ R2 rdf run 5 graded by code

BBB+
Marlow's BBB+ came from the downgrade on 2024-09-30 (A36) and stood on 1 Jun 2025.

JSON: {"rating": "BBB+"}

✅ R6 rdf+ontology run 1 graded by code

BBB+. A36 (DG to BBB+, 2024-09-30) is the latest action before 2025-06-01; A35 is a Watch and does not change the rating.

JSON: {"rating": "BBB+"}

✅ R6 rdf+ontology run 2 graded by code

BBB+.
E14's latest action before 2025-06-01 is A36 (DG to BBB+, 2024-09-30).

JSON: {"rating": "BBB+"}

✅ R6 rdf+ontology run 3 graded by code

BBB+. A36 (DG, 2024-09-30) set BBB+ and was still in effect on 2025-06-01; A35 (RW) does not change the rating.

JSON: {"rating": "BBB+"}

✅ R6 rdf+ontology run 4 graded by code

BBB+. On 2025-06-01 the rating was set by A36 (DG to BBB+, 2024-09-30). A35 (2025-11-20) came later.

JSON: {"rating": "BBB+"}

✅ R6 rdf+ontology run 5 graded by code

BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and that rating held on 1 June 2025.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 1 graded by code

BBB+. The last action before 2025-06-01 is the downgrade to BBB+ on 2024-09-30 (A36).

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 2 graded by code

BBB+. A36 (DG to BBB+, 2024-09-30) was the latest action before 1 June 2025.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 3 graded by code

BBB+. The 2024-09-30 downgrade (A36) was the latest action before 1 June 2025, and the RW action (A35) came after that date.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 4 graded by code

BBB+. Marlow was downgraded to BBB+ on 2024-09-30 (A36), and that rating stood on 2025-06-01.

JSON: {"rating": "BBB+"}

✅ R5 csv+ontology run 5 graded by code

BBB+
A36 (DG to BBB+, 2024-09-30) is the latest action on or before 2025-06-01; A35 (RW) does not change the rating.

JSON: {"rating": "BBB+"}

✅ R4 csv+markdown run 1 graded by code

BBB+. A36 (2024-09-30) downgraded E14 to BBB+, and it was still in effect on 2025-06-01; A35 (2025-11-20) came later.

JSON: {"rating": "BBB+"}

✅ R4 csv+markdown run 2 graded by code

BBB+. Marlow's rating on 1 Jun 2025 is set by A36 (downgraded to BBB+ on 2024-09-30), and the RW action A35 did not change it.

JSON: {"rating": "BBB+"}

✅ R4 csv+markdown run 3 graded by code

BBB+. A36 (30 Sep 2024) is the latest E14 action before 1 Jun 2025.

JSON: {"rating": "BBB+"}

✅ R4 csv+markdown run 4 graded by code

BBB+. E14's latest action on or before 2025-06-01 is the downgrade to BBB+ on 2024-09-30 (A36).

JSON: {"rating": "BBB+"}

✅ R4 csv+markdown run 5 graded by code

BBB+. A36 (2024-09-30, downgrade to BBB+) is the latest action before 1 Jun 2025; A35 came later.

JSON: {"rating": "BBB+"}

✅ R3 csv+padding run 1 graded by code

BBB+. It was BBB+ from the 2024-09-30 downgrade (A36) until the later actions (A35, A33).

JSON: {"rating": "BBB+"}

✅ R3 csv+padding run 2 graded by code

BBB+. A36 (2024-09-30) set BBB+, and the watch placement in A35 (2025-11-20) came later without changing the rating.

JSON: {"rating": "BBB+"}

✅ R3 csv+padding run 3 graded by code

BBB+. A36 (2024-09-30) set BBB+, and the next rating action (A35, a watch placement) came on 2025-11-20, after 1 Jun 2025.

JSON: {"rating": "BBB+"}

✅ R3 csv+padding run 4 graded by code

BBB+. A36 (2024-09-30) set BBB+, and the watch placed in A35 (2025-11-20) came after 1 June 2025.

JSON: {"rating": "BBB+"}

✅ R3 csv+padding run 5 graded by code

BBB+. E14 was downgraded from A- to BBB+ on 2024-09-30 (A36).

JSON: {"rating": "BBB+"}