Q11, run 2026-11-04-1643-sonnet
What was Marlow Utilities' rating on 1 June 2025?
Tests: Time: Marlow's actions are not in date order in the file.
Expected: rating = BBB+
csv run 1
BBB+. A36 downgraded E14 from A- on 2024-09-30.
JSON: {"rating": "BBB+"}
csv run 2
BBB+. A36 downgraded it to BBB+ on 2024-09-30, and A35 (2025-11-20) is later than 1 June 2025.
JSON: {"rating": "BBB+"}
csv run 3
BBB+. The downgrade to BBB+ was dated 2024-09-30 (A36), and the watch action only came later (A35).
JSON: {"rating": "BBB+"}
csv run 4
BBB+. E14 was downgraded from A- on 2024-09-30 (A36), and A35 (2025-11-20) was a later watch action.
JSON: {"rating": "BBB+"}
csv run 5
BBB+. Marlow was downgraded to BBB+ on 2024-09-30 (A36), and that was still in force on 2025-06-01.
JSON: {"rating": "BBB+"}
rdf run 1
BBB+. A36 (2024-09-30) is the latest action on or before that date.
JSON: {"rating": "BBB+"}
rdf run 2
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the watch only came later (A35).
JSON: {"rating": "BBB+"}
rdf run 3
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), before the 2025-11-20 watch (A35).
JSON: {"rating": "BBB+"}
rdf run 4
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the next action was in November 2025.
JSON: {"rating": "BBB+"}
rdf run 5
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the next action is 2025-11-20 (A35).
JSON: {"rating": "BBB+"}
rdf+ontology run 1
BBB+. The latest action on or before 2025-06-01 is A36 (DG BBB+, 2024-09-30).
JSON: {"rating": "BBB+"}
rdf+ontology run 2
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the watch in A35 came later.
JSON: {"rating": "BBB+"}
rdf+ontology run 3
BBB+. E14 was downgraded to BBB+ in A36 (2024-09-30), and the Watch (A35) did not come until 2025-11-20.
JSON: {"rating": "BBB+"}
rdf+ontology run 4
BBB+. E14 was downgraded to BBB+ by A36 (2024-09-30), and the Watch (A35) came later in 2025-11.
JSON: {"rating": "BBB+"}
rdf+ontology run 5
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the Watch (A35) came later.
JSON: {"rating": "BBB+"}
csv+ontology run 1
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the next action was on 2025-11-20.
JSON: {"rating": "BBB+"}
csv+ontology run 2
BBB+. E14 was downgraded to BBB+ in A36 (2024-09-30). The Watch in A35 (2025-11-20) came after this date.
JSON: {"rating": "BBB+"}
csv+ontology run 3
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the next action is 2025-11-20.
JSON: {"rating": "BBB+"}
csv+ontology run 4
BBB+. A36 (2024-09-30) downgraded E14 from A- to BBB+, and A35 only added a Watch.
JSON: {"rating": "BBB+"}
csv+ontology run 5
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and that held on 2025-06-01.
JSON: {"rating": "BBB+"}
csv+markdown run 1
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and nothing changed it before 2025-06-01.
JSON: {"rating": "BBB+"}
csv+markdown run 2
BBB+. The downgrade A36 (2024-09-30) was the latest action on or before that date.
JSON: {"rating": "BBB+"}
csv+markdown run 3
BBB+. A36 (2024-09-30) set BBB+ and it held through 1 Jun 2025.
JSON: {"rating": "BBB+"}
csv+markdown run 4
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the later watch (A35) did not change the rating.
JSON: {"rating": "BBB+"}
csv+markdown run 5
BBB+. A36 (2024-09-30) downgraded E14 to BBB+.
JSON: {"rating": "BBB+"}
csv+padding run 1
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30.
JSON: {"rating": "BBB+"}
csv+padding run 2
BBB+. A36 downgraded E14 to BBB+ on 2024-09-30, and the watch in A35 only began on 2025-11-20.
JSON: {"rating": "BBB+"}
csv+padding run 3
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and the later watch (A35) did not change the rating.
JSON: {"rating": "BBB+"}
csv+padding run 4
BBB+. A36 downgraded E14 on 2024-09-30, and A35 only adds a watch afterwards.
JSON: {"rating": "BBB+"}
csv+padding run 5
BBB+. E14 was downgraded to BBB+ on 2024-09-30 (A36), and A35 (2025-11-20) is after the question date.
JSON: {"rating": "BBB+"}