Q1, run 2026-11-04-1643-sonnet
What was Kestrel Energy's rating on 1 January 2025?
Tests: Time: a rating holds from one action to the next, so 'the rating on a date' is the latest action on or before it.
Expected: rating = A-
csv run 1
A-. A01 assigned A- on 2024-03-12 and nothing changed before 2025-01-01.
JSON: {"rating": "A-"}
csv run 2
A-. A05/A01 assigned A- on 2024-03-12, and the next action (A02) came on 2025-06-20.
JSON: {"rating": "A-"}
csv run 3
A-. E01's rating was assigned on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv run 4
A-. Kestrel's LTIDR was A- from A01 (2024-03-12) until it was downgraded in A02 (2025-06-20).
JSON: {"rating": "A-"}
csv run 5
A-. Kestrel's LTIDR was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).
JSON: {"rating": "A-"}
rdf run 1
A-. E01's LTIDR was A- from A01 (2024-03-12) until the downgrade in A02 (2025-06-20).
JSON: {"rating": "A-"}
rdf run 2
A-. E01's LTIDR was assigned A- on 2024-03-12 (A01) and stayed there until the 2025-06-20 downgrade (A02).
JSON: {"rating": "A-"}
rdf run 3
A-. E01's LTIDR (foreign currency) was assigned at A- on 2024-03-12 (A01) and not changed until 2025-06-20 (A02).
JSON: {"rating": "A-"}
rdf run 4
A-. E01's LTIDR was A- from A01 (2024-03-12) until A02 (2025-06-20).
JSON: {"rating": "A-"}
rdf run 5
A-. A01 (2024-03-12, LTIDR FC) was the latest action before 2025-01-01. The June 2025 downgrade (A02) came later.
JSON: {"rating": "A-"}
rdf+ontology run 1
A-. E01's foreign-currency LTIDR was A- from A01 (2024-03-12) until A02 (2025-06-20).
JSON: {"rating": "A-"}
rdf+ontology run 2
A-. E01's last action before 1 Jan 2025 was A02's predecessor, A01 (AS A-, 2024-03-12). The downgrade to BBB (A02) came on 2025-06-20.
JSON: {"rating": "A-"}
rdf+ontology run 3
A-. E01's LTIDR (FC) was A- from A01 (2024-03-12) and was not changed until the downgrade to BBB in A02 (2025-06-20).
JSON: {"rating": "A-"}
rdf+ontology run 4
A-. E01's long-term foreign-currency rating was set at A- by A01 (2024-03-12) and stayed until A02 (2025-06-20).
JSON: {"rating": "A-"}
rdf+ontology run 5
A-. E01's long-term foreign-currency rating was set by A01 (assigned A-, 2024-03-12) and held until A02 in June 2025.
JSON: {"rating": "A-"}
csv+ontology run 1
A-. A01 set E01's foreign-currency LTIDR at A- on 2024-03-12, and the next action (A02) came on 2025-06-20.
JSON: {"rating": "A-"}
csv+ontology run 2
A-. The latest Kestrel (E01) FC LTIDR action on or before that date is A01 (assigned A-, 2024-03-12). The downgrade A02 came later, in June 2025.
JSON: {"rating": "A-"}
csv+ontology run 3
A-. E01's LTIDR FC was assigned A- on 2024-03-12 (A01), and the next action was 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv+ontology run 4
A-. A01 (2024-03-12) set E01 at A-, and nothing changed it until A02 in June 2025.
JSON: {"rating": "A-"}
csv+ontology run 5
A-. E01's LTIDR (FC) was assigned A- on 2024-03-12 (A01) and not changed until 2025-06-20.
JSON: {"rating": "A-"}
csv+markdown run 1
A-. E01's LTIDR FC was A- from A01 (2024-03-12) until the downgrade in A02 (2025-06-20).
JSON: {"rating": "A-"}
csv+markdown run 2
A-. The 2024-03-12 assignment (A01) was still in force on 1 Jan 2025; the downgrade (A02) came in June 2025.
JSON: {"rating": "A-"}
csv+markdown run 3
A-. E01's latest action on or before 1 Jan 2025 is A01 (A-). The downgrade A02 came in June 2025.
JSON: {"rating": "A-"}
csv+markdown run 4
A-. E01's LTIDR FC was A- from A01 (2024-03-12) and not changed until A02 in June 2025.
JSON: {"rating": "A-"}
csv+markdown run 5
A-. E01's LTIDR FC was set by A01 (2024-03-12) and not changed until A02 (2025-06-20).
JSON: {"rating": "A-"}
csv+padding run 1
A-. A01 assigned E01 A- on 2024-03-12, and nothing changed before 2025-01-01 (A02 is dated 2025-06-20).
JSON: {"rating": "A-"}
csv+padding run 2
A-. E01's rating was assigned at A- on 2024-03-12 (A01) and not changed until A02 on 2025-06-20.
JSON: {"rating": "A-"}
csv+padding run 3
A-. E01 was assigned A- on 2024-03-12 (A01) and not downgraded until 2025-06-20 (A02).
JSON: {"rating": "A-"}
csv+padding run 4
A-. A01 assigned E01 A- on 2024-03-12, and the next action is A02 in 2025-06.
JSON: {"rating": "A-"}
csv+padding run 5
A-. A01 assigned A- to E01 on 2024-03-12, and the next action (A02) came later, on 2025-06-20.
JSON: {"rating": "A-"}